{"title":"Strategic architectural flexibility","authors":"D. Port, LiGuo Huang","doi":"10.1109/ICSM.2003.1235449","DOIUrl":null,"url":null,"abstract":"Most projects commit to a set of required features and (at best) a most-likely budget and schedule for developing them. This means that, even before the changes start coming, there is roughly a 50% chance that the most-likely budget and schedule are insufficient, and the project is headed for an overrun. Planning for change in a development project is essential. But how much should be invested in architectural flexibility to accommodate this? Too little will incur a high risk of costly late changes and architecture breakage; too much may not leave enough time to implement a sufficient set of critical capabilities. We have been using and refining a model based approach to assist in determining an appropriate degree of architectural flexibility by introducing a modularity factor for the software architecture based on the core capabilities and a set of anticipated changes. This experience has helped us identify the critical success factors for strategically applying architectural flexibility within tight constraints such as cost, quality, or a fixed schedule. We elaborate the critical success factors, present a case study of their application, and their relation to recent research results in such areas as strategic design.","PeriodicalId":141256,"journal":{"name":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software Maintenance, 2003. ICSM 2003. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.2003.1235449","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11
Abstract
Most projects commit to a set of required features and (at best) a most-likely budget and schedule for developing them. This means that, even before the changes start coming, there is roughly a 50% chance that the most-likely budget and schedule are insufficient, and the project is headed for an overrun. Planning for change in a development project is essential. But how much should be invested in architectural flexibility to accommodate this? Too little will incur a high risk of costly late changes and architecture breakage; too much may not leave enough time to implement a sufficient set of critical capabilities. We have been using and refining a model based approach to assist in determining an appropriate degree of architectural flexibility by introducing a modularity factor for the software architecture based on the core capabilities and a set of anticipated changes. This experience has helped us identify the critical success factors for strategically applying architectural flexibility within tight constraints such as cost, quality, or a fixed schedule. We elaborate the critical success factors, present a case study of their application, and their relation to recent research results in such areas as strategic design.