Study on condition pre-warning method of power transformer based on load time series model

Hongbin Wang, Shuangyu Du, Jianzhuo Dai, R. Ming, Dong Ming
{"title":"Study on condition pre-warning method of power transformer based on load time series model","authors":"Hongbin Wang, Shuangyu Du, Jianzhuo Dai, R. Ming, Dong Ming","doi":"10.1109/STA.2015.7505103","DOIUrl":null,"url":null,"abstract":"Power transformer is one of key equipment in power system and its normal operation guarantees reliability and safety of power transmission. In order to keep power transformer in good condition, regular inspection and maintenance is needed after equipment put into service. Various preventive test, on-line monitoring and portable test are must, but condition evaluation and fault diagnosis for power transformer still is kind of art, which normally depend on standards, guideline or accumulated experiences on-site. In this paper, insulating condition is evaluated by equipment's operating load, and time series model is established to analyze load characteristics. After outlier value extraction and data reduction, two typical load growth modes have been proposed. Results show that the proposed load time series model could be applied to equipment operating status trend analysis. This approach provides a new idea for power transformer insulation pre-warning by making use of power transformer load characteristic analysis.","PeriodicalId":128530,"journal":{"name":"2015 16th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 16th International Conference on Sciences and Techniques of Automatic Control and Computer Engineering (STA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/STA.2015.7505103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Power transformer is one of key equipment in power system and its normal operation guarantees reliability and safety of power transmission. In order to keep power transformer in good condition, regular inspection and maintenance is needed after equipment put into service. Various preventive test, on-line monitoring and portable test are must, but condition evaluation and fault diagnosis for power transformer still is kind of art, which normally depend on standards, guideline or accumulated experiences on-site. In this paper, insulating condition is evaluated by equipment's operating load, and time series model is established to analyze load characteristics. After outlier value extraction and data reduction, two typical load growth modes have been proposed. Results show that the proposed load time series model could be applied to equipment operating status trend analysis. This approach provides a new idea for power transformer insulation pre-warning by making use of power transformer load characteristic analysis.
基于负荷时间序列模型的电力变压器状态预警方法研究
电力变压器是电力系统的关键设备之一,它的正常运行保证了电力输送的可靠性和安全性。为了保持电力变压器的良好状态,在设备投入使用后,需要进行定期的检查和维护。各种预防性试验、在线监测和便携式试验是必不可少的,但电力变压器的状态评估和故障诊断仍然是一门艺术,通常依赖于标准、指南或现场积累的经验。本文采用设备运行负荷评价绝缘状态,建立时间序列模型分析负荷特性。经过离群值提取和数据约简,提出了两种典型的负荷增长模式。结果表明,所建立的负荷时间序列模型可用于设备运行状态趋势分析。该方法利用电力变压器负载特性分析,为电力变压器绝缘预警提供了新的思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信