Model of interruptible load contract for minimum compensation cost

Youbing Zhang, Wei Chen, Q. Gao, Zhijian Liu, Yijia Cao
{"title":"Model of interruptible load contract for minimum compensation cost","authors":"Youbing Zhang, Wei Chen, Q. Gao, Zhijian Liu, Yijia Cao","doi":"10.1109/UPEC.2008.4651458","DOIUrl":null,"url":null,"abstract":"Interruptible load (IL) management as an important component of demand-side management in electricity market affects much the safe and economic operation of the power systems. The cost-benefit of interruptible load participants is analyzed in this paper. The discrete customer category is proposed to indicate the expected compensation for the blackout. This paper presents a model of IL contract, in which the objective function is the minimum compensation cost paid by the power company. The benefits of the power company and the customer are both considered as the restrictions of the model. The actual system examples show the validity of the proposed model.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651458","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Interruptible load (IL) management as an important component of demand-side management in electricity market affects much the safe and economic operation of the power systems. The cost-benefit of interruptible load participants is analyzed in this paper. The discrete customer category is proposed to indicate the expected compensation for the blackout. This paper presents a model of IL contract, in which the objective function is the minimum compensation cost paid by the power company. The benefits of the power company and the customer are both considered as the restrictions of the model. The actual system examples show the validity of the proposed model.
补偿成本最小的可中断负荷契约模型
可中断负荷管理作为电力市场需求侧管理的重要组成部分,直接关系到电力系统的安全经济运行。本文分析了可中断负荷参与者的成本效益。提出了离散客户类别来表示停电的预期补偿。本文提出了以电力公司支付的补偿费用最小为目标函数的电力合同模型。电力公司和用户的利益都是模型的约束条件。系统实例验证了该模型的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信