Dynamic programming approach for solving power generating unit commitment problem

P. K. Singhal, R. Naresh, Sharma
{"title":"Dynamic programming approach for solving power generating unit commitment problem","authors":"P. K. Singhal, R. Naresh, Sharma","doi":"10.1109/ICCCT.2011.6075161","DOIUrl":null,"url":null,"abstract":"In this paper, a large scale Unit Commitment (UC) problem has been solved using Conventional dynamic programming (CDP), Sequential dynamic programming (SDP) and Truncation dynamic programming (TDP) without time constraints and the results show the comparison of production cost and CPU time. The UC provides an approach to decrease the cost and improve reliability of the network. The UC is a dynamic process, and the generation plan is always changing according to different load and network topology.","PeriodicalId":285986,"journal":{"name":"2011 2nd International Conference on Computer and Communication Technology (ICCCT-2011)","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"55","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd International Conference on Computer and Communication Technology (ICCCT-2011)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCCT.2011.6075161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 55

Abstract

In this paper, a large scale Unit Commitment (UC) problem has been solved using Conventional dynamic programming (CDP), Sequential dynamic programming (SDP) and Truncation dynamic programming (TDP) without time constraints and the results show the comparison of production cost and CPU time. The UC provides an approach to decrease the cost and improve reliability of the network. The UC is a dynamic process, and the generation plan is always changing according to different load and network topology.
求解发电机组投用问题的动态规划方法
本文采用常规动态规划(CDP)、顺序动态规划(SDP)和截断动态规划(TDP)三种不带时间约束的方法求解了大规模机组投入(UC)问题,结果显示了生产成本和CPU时间的比较。UC为降低成本、提高网络可靠性提供了一种途径。UC是一个动态的过程,根据不同的负载和网络拓扑结构,生成计划总是会发生变化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信