Optimalisasi Waktu Kerja Karyawan Menggunakan Metode Hungarian (Studi Kasus CV Bintang Jaya)

Wulan Raisa Nabila, Dene Herwanto, Winda Rana Zahra
{"title":"Optimalisasi Waktu Kerja Karyawan Menggunakan Metode Hungarian (Studi Kasus CV Bintang Jaya)","authors":"Wulan Raisa Nabila, Dene Herwanto, Winda Rana Zahra","doi":"10.30998/string.v7i1.13185","DOIUrl":null,"url":null,"abstract":"The most common problem in business and industry today is the optimal allocation of production resources, i.e. providing different levels of productivity in different tasks. The challenge of CV Bintang Jaya is how to optimize working hours according to the working hours of its employees. The purpose of this study is to determine the working time of employees in accordance with the work. The research method used is hungarian using the POM-QM application for Windows. Data are collected through observation, interviews, documentation and literature study. From this study, the best results are obtained based on the work. Employee 1 takes 17 minutes to perform the wood cutting operation, employee 2 takes 35 minutes to make a pattern, employee 3 takes 10 minutes to perform the smoothing operation, and employee 4 takes 10 minutes to perform the assembly operation.","PeriodicalId":177991,"journal":{"name":"STRING (Satuan Tulisan Riset dan Inovasi Teknologi)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"STRING (Satuan Tulisan Riset dan Inovasi Teknologi)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30998/string.v7i1.13185","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The most common problem in business and industry today is the optimal allocation of production resources, i.e. providing different levels of productivity in different tasks. The challenge of CV Bintang Jaya is how to optimize working hours according to the working hours of its employees. The purpose of this study is to determine the working time of employees in accordance with the work. The research method used is hungarian using the POM-QM application for Windows. Data are collected through observation, interviews, documentation and literature study. From this study, the best results are obtained based on the work. Employee 1 takes 17 minutes to perform the wood cutting operation, employee 2 takes 35 minutes to make a pattern, employee 3 takes 10 minutes to perform the smoothing operation, and employee 4 takes 10 minutes to perform the assembly operation.
员工最佳工作时间采用匈牙利语的方法(Jaya star案例研究)
当今商业和工业中最常见的问题是生产资源的最佳配置,即在不同的任务中提供不同水平的生产率。CV Bintang Jaya面临的挑战是如何根据员工的工作时间优化工作时间。本研究的目的是根据工作来确定员工的工作时间。使用的研究方法是匈牙利使用POM-QM应用程序的Windows。通过观察法、访谈法、文献法和文献法收集数据。通过本研究,在工作基础上取得了最佳效果。员工1进行木材切割操作需要17分钟,员工2制作一个图案需要35分钟,员工3进行平滑操作需要10分钟,员工4进行装配操作需要10分钟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信