{"title":"Assessment of Failure and Repair Behaviours of the Jebba Hydroelectric Power Station","authors":"C. T. Thomas, O. Ogunbiyi, M. Akorede, J. Olufeagba","doi":"10.11113/ELEKTRIKA.V17N3.113","DOIUrl":null,"url":null,"abstract":"Nigeria power generation is circa 4000 MW as at October 2016, this is far less than the national required value.Jebba Hydroelectric Power Station (JHEPS) is one of the three major hydropower stations in the country which its maximumaverage generation value is still less than the rated value of 578.4 MW. This paper presented some basic concepts of analysisof failure and repair. An algorithm was set up to extract the contiguous set of up-times and down-times to determine time-tofail (TTR) and time-to-repair (TTR) events, these events were analyzed for stochastic study. It was observed that the longestup time was 262 days and seen in turbo-alternator unit five, while the shortest was zero day and seen in the entire units exceptthat of unit two. The longest downtime was 133 days and seen in the turbo-alternator of unit one, the least time-to-repair is aday and common to all the units. The frequency distributions for both TTF and TTR showed that 79% of TTF events and 57%of TTR events are distributed in the first 2 classes","PeriodicalId":312612,"journal":{"name":"ELEKTRIKA- Journal of Electrical Engineering","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ELEKTRIKA- Journal of Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11113/ELEKTRIKA.V17N3.113","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Nigeria power generation is circa 4000 MW as at October 2016, this is far less than the national required value.Jebba Hydroelectric Power Station (JHEPS) is one of the three major hydropower stations in the country which its maximumaverage generation value is still less than the rated value of 578.4 MW. This paper presented some basic concepts of analysisof failure and repair. An algorithm was set up to extract the contiguous set of up-times and down-times to determine time-tofail (TTR) and time-to-repair (TTR) events, these events were analyzed for stochastic study. It was observed that the longestup time was 262 days and seen in turbo-alternator unit five, while the shortest was zero day and seen in the entire units exceptthat of unit two. The longest downtime was 133 days and seen in the turbo-alternator of unit one, the least time-to-repair is aday and common to all the units. The frequency distributions for both TTF and TTR showed that 79% of TTF events and 57%of TTR events are distributed in the first 2 classes
杰巴水电站失效与修复行为评估
截至2016年10月,尼日利亚的发电量约为4000兆瓦,远低于国家要求的值。杰巴水电站是我国三大水电站之一,其最大平均发电量仍低于额定值578.4 MW。本文介绍了故障分析与维修的一些基本概念。建立了一种提取连续的启动时间和停机时间的算法,以确定故障时间(TTR)和修复时间(TTR)事件,并对这些事件进行了随机分析。研究发现,启动时间最长的是5号机组,为262天;最短的是0天,除2号机组外,其余机组均有启动时间。停机时间最长的是1号机组的涡轮交流发电机,为133天;维修时间最短的是1天,所有机组都有。TTF和TTR的频率分布表明,TTF事件的79%和TTR事件的57%分布在前2类
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信