Climbing and pole line hardware installation robot for construction of distribution lines

J. Allan, S. Lavoie, S. Reiher, G. Lambert
{"title":"Climbing and pole line hardware installation robot for construction of distribution lines","authors":"J. Allan, S. Lavoie, S. Reiher, G. Lambert","doi":"10.1109/CARPI.2010.5624474","DOIUrl":null,"url":null,"abstract":"This paper presents a new robot prototype for the construction of Hydro-Québec's overhead distribution lines. It details the main sub-systems of the robot, such as the climbing system (for climbing poles), the crossarm manipulation system (which handles crossarms and selects tools for drilling holes and inserting bolts), and the bolting system (for fixing crossarms and braces on poles). The robot is made to ascend and descend a pole by teleoperation, and the installation of a pre-assembled crossarm (with brace, pins, insulators and clamps) at the top of a 40-foot pole is performed in full automatic mode. Tests have demonstrated the efficiency of this robotized construction method in installing the line hardware of a three-phase distribution line on a 40-foot pole in 25 minutes.","PeriodicalId":374619,"journal":{"name":"2010 1st International Conference on Applied Robotics for the Power Industry","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 1st International Conference on Applied Robotics for the Power Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CARPI.2010.5624474","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15

Abstract

This paper presents a new robot prototype for the construction of Hydro-Québec's overhead distribution lines. It details the main sub-systems of the robot, such as the climbing system (for climbing poles), the crossarm manipulation system (which handles crossarms and selects tools for drilling holes and inserting bolts), and the bolting system (for fixing crossarms and braces on poles). The robot is made to ascend and descend a pole by teleoperation, and the installation of a pre-assembled crossarm (with brace, pins, insulators and clamps) at the top of a 40-foot pole is performed in full automatic mode. Tests have demonstrated the efficiency of this robotized construction method in installing the line hardware of a three-phase distribution line on a 40-foot pole in 25 minutes.
配电线路施工爬杆线硬件安装机器人
本文介绍了一种新型的用于水电曲海架空配电线路施工的机器人样机。详细介绍了机器人的主要子系统,如攀爬系统(攀爬杆子)、横臂操作系统(处理横臂并选择钻孔和插螺栓的工具)和螺栓系统(将横臂和支架固定在杆子上)。通过远程操作,机器人可以上下一根杆子,在40英尺高的杆子顶部安装一个预组装的横臂(包括支架、销子、绝缘体和夹子),并以全自动模式进行。测试表明,这种自动化施工方法在25分钟内将三相配电线路硬件安装在40英尺的杆子上,效率很高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信