{"title":"Estimating drainable gas reserves by the method of material balance","authors":"A. Kislitsyn, S. V. Kuznetsov","doi":"10.31660/0445-0108-2022-6-56-72","DOIUrl":null,"url":null,"abstract":"The algorithm of estimating the reserves of gas deposits by the material balance method is described. The advantages of this method are the use of rather precise field technological information for calculations and the possibility of regular checks for compliance with the actual nature of field development. However, there are problems of practical application of this method. One of them is the determination of average weighted pressure for the whole gas-saturated volume, especially for low permeable reservoirs with deep depression craters around wells. The process of correct determination of weighted average pressure by means of isobar map and map of effective gassaturated thicknesses of gas reservoirs is proposed and described. Another problem is the long time interval between measurements of reservoir pressure during the field development. We offer the method that allows increasing frequency of isobar mapping by interpolation of reservoir pressure values by calculating this value through the productivity of wells in order to perform operational analysis of the field development. The input data for the calculation are the dynamics of gas flow rate and wellhead pressure dynamics. This approach allows us to estimate formation pressure around each well outside the de-resistivity funnel at any time. The article presents the results of testing the proposed method under field conditions at one of the Yamal fields. The results of the analysis show the difference in the volume of drained reserves with the geological model for a low permeable layer. The difference in the reserves volume estimation by the material balance method using the isobar map was 18 % of the initial geological reserves. The analysis of the reasons of divergence of the drilled reserves was carried out and the fact of differently sorted excavation along the section and the presence of uninvolved reserves was revealed.","PeriodicalId":240239,"journal":{"name":"Oil and Gas Studies","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and Gas Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31660/0445-0108-2022-6-56-72","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The algorithm of estimating the reserves of gas deposits by the material balance method is described. The advantages of this method are the use of rather precise field technological information for calculations and the possibility of regular checks for compliance with the actual nature of field development. However, there are problems of practical application of this method. One of them is the determination of average weighted pressure for the whole gas-saturated volume, especially for low permeable reservoirs with deep depression craters around wells. The process of correct determination of weighted average pressure by means of isobar map and map of effective gassaturated thicknesses of gas reservoirs is proposed and described. Another problem is the long time interval between measurements of reservoir pressure during the field development. We offer the method that allows increasing frequency of isobar mapping by interpolation of reservoir pressure values by calculating this value through the productivity of wells in order to perform operational analysis of the field development. The input data for the calculation are the dynamics of gas flow rate and wellhead pressure dynamics. This approach allows us to estimate formation pressure around each well outside the de-resistivity funnel at any time. The article presents the results of testing the proposed method under field conditions at one of the Yamal fields. The results of the analysis show the difference in the volume of drained reserves with the geological model for a low permeable layer. The difference in the reserves volume estimation by the material balance method using the isobar map was 18 % of the initial geological reserves. The analysis of the reasons of divergence of the drilled reserves was carried out and the fact of differently sorted excavation along the section and the presence of uninvolved reserves was revealed.
用物质平衡法估算可泄放瓦斯储量
介绍了用物质平衡法估算气藏储量的算法。这种方法的优点是使用相当精确的实地技术资料进行计算,并有可能定期检查是否符合实地开发的实际性质。然而,该方法在实际应用中存在一些问题。其中之一是确定整个含气饱和体积的平均加权压力,特别是对于井周凹陷深的低渗透储层。提出并描述了利用等压线图和气藏有效饱和厚度图正确确定加权平均压力的过程。另一个问题是,在油田开发过程中,储层压力测量间隔时间长。我们提供了一种方法,通过对油藏压力值的插值来增加等压线作图的频率,该方法通过油井的产能来计算该值,从而对油田开发进行操作分析。计算的输入数据为气体流量动态和井口压力动态。这种方法使我们能够随时估计除电阻率漏斗外每口井周围的地层压力。本文介绍了该方法在亚马尔某油田现场条件下的试验结果。分析结果表明,低渗透层的排水储量体积与地质模型存在差异。利用等压线图的物质平衡法估算储量体积的差异为初始地质储量的18%。分析了钻孔储量分化的原因,揭示了沿断面开挖分选不齐和未涉及储量存在的事实。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信