{"title":"Why Projects Fail","authors":"Utkarsh Giri, Akash Aggrawal, Shubham Pandey","doi":"10.14741/ijcet/v.10.1.7","DOIUrl":null,"url":null,"abstract":"Projects that do not meet the original time, cost 8 quality requirements are said to be failed Projects.\nFour Pillars of Project: Man, machine, money 8 managements; if any of the four pillars get disturbed the building of\nprojects fails. Research reveals that project management in many firms 8 companies currently ranges from\nundisciplined to confusion. Most of the project failure is related to the time, cost 8 quality paradigm is the motivation\nof research on this topic. This paper examines some of the issues 8 casual factors of projects failure.","PeriodicalId":192480,"journal":{"name":"International Journal of Current Engineering and Technology","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Current Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14741/ijcet/v.10.1.7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Projects that do not meet the original time, cost 8 quality requirements are said to be failed Projects.
Four Pillars of Project: Man, machine, money 8 managements; if any of the four pillars get disturbed the building of
projects fails. Research reveals that project management in many firms 8 companies currently ranges from
undisciplined to confusion. Most of the project failure is related to the time, cost 8 quality paradigm is the motivation
of research on this topic. This paper examines some of the issues 8 casual factors of projects failure.