Simulation Research on Safe Load-Reducing Operation Margin of Nuclear Power Unit With Clogging of the CFI Drum Net

Jinchao Liu, Yaozu Lin, Bijun Chen, Xue Lyu, Jiayi Li, Heng Zhang
{"title":"Simulation Research on Safe Load-Reducing Operation Margin of Nuclear Power Unit With Clogging of the CFI Drum Net","authors":"Jinchao Liu, Yaozu Lin, Bijun Chen, Xue Lyu, Jiayi Li, Heng Zhang","doi":"10.1115/icone29-92540","DOIUrl":null,"url":null,"abstract":"\n As the final heat sink of the nuclear power plant, the cool source is responsible for the safety function of the waste heat export of the reactor. The explosive invasion of marine organisms and other wastes have a great impact on the cold source system of nuclear power plants, which will lead to transient events, load reduction and shutdown of nuclear power unit, and even affect the availability of the cold source system in severe cases. which are huge threats and challenges for the safe and stable operation of unit. thereby reducing the power generation efficiency, safety, economy, and sustainable development of nuclear power plants. Clogging of the CFI drum net is one of the important factors causing cold source system accidents. this paper puts forward the solution idea of maintaining the water level of the forebay through the variable frequency pump, so as to ensure that the CRF pump keeps running state under the condition of cold source blockage, so as to maintain the function of the cold source system. and based on the full range simulator of nuclear power units, consider CFI drum network differential pressure high alarm failure combined with a monitoring device for the blockage degree of the drum net, the scheme is simulated and verified, and the load that the nuclear power unit can operate safely under different blocking degrees of drum network is given. the research results of this paper provide a solution for alleviating the cold source problem, and the solution can also provide a reference for the safety improvement of the cold source of actual unit and the design of new reactor.","PeriodicalId":365848,"journal":{"name":"Volume 5: Nuclear Safety, Security, and Cyber Security","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 5: Nuclear Safety, Security, and Cyber Security","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/icone29-92540","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As the final heat sink of the nuclear power plant, the cool source is responsible for the safety function of the waste heat export of the reactor. The explosive invasion of marine organisms and other wastes have a great impact on the cold source system of nuclear power plants, which will lead to transient events, load reduction and shutdown of nuclear power unit, and even affect the availability of the cold source system in severe cases. which are huge threats and challenges for the safe and stable operation of unit. thereby reducing the power generation efficiency, safety, economy, and sustainable development of nuclear power plants. Clogging of the CFI drum net is one of the important factors causing cold source system accidents. this paper puts forward the solution idea of maintaining the water level of the forebay through the variable frequency pump, so as to ensure that the CRF pump keeps running state under the condition of cold source blockage, so as to maintain the function of the cold source system. and based on the full range simulator of nuclear power units, consider CFI drum network differential pressure high alarm failure combined with a monitoring device for the blockage degree of the drum net, the scheme is simulated and verified, and the load that the nuclear power unit can operate safely under different blocking degrees of drum network is given. the research results of this paper provide a solution for alleviating the cold source problem, and the solution can also provide a reference for the safety improvement of the cold source of actual unit and the design of new reactor.
CFI鼓网堵塞情况下核电机组安全减载运行裕度仿真研究
冷源作为核电站的最终散热器,承担着反应堆余热出口的安全功能。海洋生物及其他废弃物的爆炸性入侵对核电站冷源系统的影响很大,会导致核电机组发生瞬态事件,导致机组负荷减少、停机,严重时甚至影响冷源系统的可用性。这对机组的安全稳定运行构成了巨大的威胁和挑战。从而降低了核电站的发电效率、安全性、经济性和可持续性。冷源系统鼓网堵塞是造成冷源系统事故的重要因素之一。本文提出了通过变频泵维持前舱水位的解决思路,以保证CRF泵在冷源堵塞的情况下仍保持运行状态,从而维持冷源系统的功能。并基于核电机组全工况模拟器,考虑CFI鼓网差压高报警故障,结合鼓网堵塞程度监测装置,对方案进行了仿真验证,给出了核电机组在不同鼓网堵塞程度下可安全运行的负荷。本文的研究成果为缓解冷源问题提供了解决方案,也可为实际机组冷源的安全性改进和新型反应堆的设计提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信