{"title":"Joint planning for spare parts inventory and preventive maintenance in a multi-echelon network","authors":"Yue Shi, Yisha Xiang, T. Jin, Yueqin Li","doi":"10.1504/IJIR.2016.10002900","DOIUrl":null,"url":null,"abstract":"Spare parts inventory and preventative maintenance play a vital role in ensuring operational availability of capital equipment. This paper investigates the cost-reliability benefits from jointly optimising preventive maintenance and spare parts inventory. Due to the problem complexity and the mathematical intractability, we propose a simulation framework to tackle this joint planning problem in a multi-echelon network. The general simulation model developed in this paper allows a closer-to-reality analysis of joint decisions on spare parts inventory and preventive maintenance for a fleet of equipment with increasing failure rates. Both block- and age-based preventive maintenance policies are considered. We also adopt a performance-based contracting approach to analysing the trade-off between inventory cost and target availability in different incentive mechanisms. Numerical experiments are presented to illustrate the effectiveness of the joint policies.","PeriodicalId":113309,"journal":{"name":"International Journal of Inventory Research","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Inventory Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIR.2016.10002900","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Spare parts inventory and preventative maintenance play a vital role in ensuring operational availability of capital equipment. This paper investigates the cost-reliability benefits from jointly optimising preventive maintenance and spare parts inventory. Due to the problem complexity and the mathematical intractability, we propose a simulation framework to tackle this joint planning problem in a multi-echelon network. The general simulation model developed in this paper allows a closer-to-reality analysis of joint decisions on spare parts inventory and preventive maintenance for a fleet of equipment with increasing failure rates. Both block- and age-based preventive maintenance policies are considered. We also adopt a performance-based contracting approach to analysing the trade-off between inventory cost and target availability in different incentive mechanisms. Numerical experiments are presented to illustrate the effectiveness of the joint policies.