Distribution network island separation with distributed generation (DG) based on dynamic planning

He Chunguang, Zhu Jiaming, D. Xin, Wang Lei, Zhai Guangxin, Xie Xiaolin, Liu Peng, Liu Yong
{"title":"Distribution network island separation with distributed generation (DG) based on dynamic planning","authors":"He Chunguang, Zhu Jiaming, D. Xin, Wang Lei, Zhai Guangxin, Xie Xiaolin, Liu Peng, Liu Yong","doi":"10.1109/IAEAC.2017.8054316","DOIUrl":null,"url":null,"abstract":"DG islanding operation can efficiently improve the reliability of customers when main power supply network has a fault. This paper installs the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network when the fault is isolated. In the mean time, the tree can be separated by dynamic planning according to the goal of the restoring load as much as possible. Finally, it's to use IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly related to the output of DG.","PeriodicalId":432109,"journal":{"name":"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAEAC.2017.8054316","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

DG islanding operation can efficiently improve the reliability of customers when main power supply network has a fault. This paper installs the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network when the fault is isolated. In the mean time, the tree can be separated by dynamic planning according to the goal of the restoring load as much as possible. Finally, it's to use IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly related to the output of DG.
基于动态规划的分布式发电配网孤岛分离
在主供电网络出现故障时,DG孤岛运行可以有效地提高用户的可靠性。本文基于最小生成树的概念建立了孤岛权模型。然后在故障隔离时,通过最小树生成无故障区域,形成径向配电网。同时,根据尽可能多的恢复负荷的目标,通过动态规划对树进行分离。最后以118个节点的IEEE配电系统为例进行孤岛分离。结果表明,该方法是合理有效的,其可靠性直接关系到DG的输出。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信