{"title":"Planning of Microgrid Based on Information Gap Decision Theory","authors":"Ke Sun, Chun Li, Q. Peng","doi":"10.1109/EI250167.2020.9347087","DOIUrl":null,"url":null,"abstract":"At present, more electric vehicles are connected to the microgrid, and with the increase in load uncertainty, it can no longer meet the new demand. In order to establish a microgrid considering the long-term load growth at the planning level, this paper analyzes the economic cost of microgrid planning. Aiming at the uncertainty of the long-term load growth, the information gap decision theory is used to simulate and coordinate the microgrid planning. Finally, the calculation example based on an industrial park verifies that the proposed planning model can help planning decision-makers cope with uncertainty at the optimal cost, and studies the impact of electricity prices on planning.","PeriodicalId":339798,"journal":{"name":"2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 4th Conference on Energy Internet and Energy System Integration (EI2)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EI250167.2020.9347087","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
At present, more electric vehicles are connected to the microgrid, and with the increase in load uncertainty, it can no longer meet the new demand. In order to establish a microgrid considering the long-term load growth at the planning level, this paper analyzes the economic cost of microgrid planning. Aiming at the uncertainty of the long-term load growth, the information gap decision theory is used to simulate and coordinate the microgrid planning. Finally, the calculation example based on an industrial park verifies that the proposed planning model can help planning decision-makers cope with uncertainty at the optimal cost, and studies the impact of electricity prices on planning.