{"title":"Multi-criteria selection for TNB transmission line route using AHP and GIS","authors":"F. Husain, N. A. Sulaiman, K. A. Hashim, A. Samad","doi":"10.1109/ICSENGT.2012.6339292","DOIUrl":null,"url":null,"abstract":"Tenaga Nasional Berhad (TNB) to provide electricity supply in Peninsular Malaysia and was established in 1990. It involved in the generation, transmission, distribution and electricity in Peninsular Malaysia. This study is aimed at studying and determining the optimum route of transmission line using AHP and GIS. Kajang District in Selangor was selected as a study site. Transmission line routing involves a variety of criteria for determine of the suitable route. Alternative routes that balance community input with the most convincing environmental impact, build ability, the use of current and future land, project costs and the needs of a particular electrical system. Four phases of route selection for a transmission line such as Macro Corridor study area, Alternative corridors, Alternative Route, and Preferred Route.","PeriodicalId":325365,"journal":{"name":"2012 International Conference on System Engineering and Technology (ICSET)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on System Engineering and Technology (ICSET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSENGT.2012.6339292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
Tenaga Nasional Berhad (TNB) to provide electricity supply in Peninsular Malaysia and was established in 1990. It involved in the generation, transmission, distribution and electricity in Peninsular Malaysia. This study is aimed at studying and determining the optimum route of transmission line using AHP and GIS. Kajang District in Selangor was selected as a study site. Transmission line routing involves a variety of criteria for determine of the suitable route. Alternative routes that balance community input with the most convincing environmental impact, build ability, the use of current and future land, project costs and the needs of a particular electrical system. Four phases of route selection for a transmission line such as Macro Corridor study area, Alternative corridors, Alternative Route, and Preferred Route.
Tenaga national Berhad (TNB)成立于1990年,为马来西亚半岛提供电力供应。它涉及马来西亚半岛的发电、输电、配电和电力。本研究旨在运用层次分析法和地理信息系统的方法研究和确定输电线路的最优路线。雪兰莪州的加让区被选为研究地点。传输线的路由涉及到各种确定合适路由的标准。可选路线平衡社区投入与最具说服力的环境影响、建筑能力、当前和未来土地的使用、项目成本和特定电力系统的需求。传输线路线选择的四个阶段,如宏观走廊研究区、备选走廊、备选路线和优选路线。