An Analysis of EIA Report of the Second International Airport Project, Nepal

Shree G. Shah
{"title":"An Analysis of EIA Report of the Second International Airport Project, Nepal","authors":"Shree G. Shah","doi":"10.3126/HN.V24I0.23585","DOIUrl":null,"url":null,"abstract":"Environmental Impact Assessment (EIA) is a planning tool which enables decision makers to accept environmentally friendly projects and reject environment damaging projects or their certain components. EIA has been mandatory in Nepal since the enactment of Environment Protection Act in 1997. Usually in Nepal, EIA is done for a project late in the project cycle after many important decisions on design and locations have already been made. While in case of government sponsored projects, EIA has remained as ‘pro forma’ compliance with government’s legal requirements. This paper analyses outputs of approved EIA of a mega infrastructure project “Second International Airport Project” which government wants to implement despite of protests by conservationists, and environmental and social activists. There are technocratic problems in EIA Report such as informational weaknesses, insufficient analysis of impacts, and inadequately proposed mitigations measures. It indicates political influence on EIA. This paper suggests making policy decision on size and nature of an international airport and its facilities, alternative locations avoiding ecologically sensitive area, and source of funding. It proposes to conduct a comprehensive Environmental and Social Impact Assessment (ESIA) complying with national and international environmental and social safeguards, before making any decision to fell trees.","PeriodicalId":137822,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V24I0.23585","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Environmental Impact Assessment (EIA) is a planning tool which enables decision makers to accept environmentally friendly projects and reject environment damaging projects or their certain components. EIA has been mandatory in Nepal since the enactment of Environment Protection Act in 1997. Usually in Nepal, EIA is done for a project late in the project cycle after many important decisions on design and locations have already been made. While in case of government sponsored projects, EIA has remained as ‘pro forma’ compliance with government’s legal requirements. This paper analyses outputs of approved EIA of a mega infrastructure project “Second International Airport Project” which government wants to implement despite of protests by conservationists, and environmental and social activists. There are technocratic problems in EIA Report such as informational weaknesses, insufficient analysis of impacts, and inadequately proposed mitigations measures. It indicates political influence on EIA. This paper suggests making policy decision on size and nature of an international airport and its facilities, alternative locations avoiding ecologically sensitive area, and source of funding. It proposes to conduct a comprehensive Environmental and Social Impact Assessment (ESIA) complying with national and international environmental and social safeguards, before making any decision to fell trees.
尼泊尔第二国际机场项目环评报告分析
环境影响评估(EIA)是一种规划工具,使决策者能够接受环境友好型项目,并拒绝环境破坏项目或其某些组成部分。自1997年颁布《环境保护法》以来,环境影响评估在尼泊尔是强制性的。通常在尼泊尔,环境影响评估是在项目周期的后期进行的,在此之前,许多关于设计和地点的重要决定已经做出。而对于政府资助的项目,环评仍然是“形式上”符合政府的法律要求。本文分析了大型基础设施项目“第二国际机场项目”的环境影响评估结果,该项目是政府不顾环保人士、环境和社会活动家的抗议而执意实施的。环评报告存在信息不足、影响分析不充分、缓解措施建议不充分等技术性问题。这表明了政治对环境影响评估的影响。建议对国际机场及其设施的规模、性质、避开生态敏感区的备选地点、资金来源等进行决策。它建议在做出任何砍伐树木的决定之前,根据国家和国际环境和社会保障措施,进行全面的环境和社会影响评估(ESIA)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信