{"title":"The KRG GRID Network Comparison Between Two Different Years 2013 and 2019","authors":"Dana Bahram Khudhur, Z. Müller","doi":"10.1109/EPE51172.2020.9269166","DOIUrl":null,"url":null,"abstract":"The development of national electric power network infrastructure in the Kurdistan region of Iraq has shown substantial growth in the last decades. The goal of this paper is to show the difference in the electric power network between two different years, and how gradually the demand for energy consumption was increasing. The growth includes the generation, transmission lines, Substation, and load demand. Furthermore, it is good to present the expansion plans concerning the factors mentioned above.","PeriodicalId":177031,"journal":{"name":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE51172.2020.9269166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The development of national electric power network infrastructure in the Kurdistan region of Iraq has shown substantial growth in the last decades. The goal of this paper is to show the difference in the electric power network between two different years, and how gradually the demand for energy consumption was increasing. The growth includes the generation, transmission lines, Substation, and load demand. Furthermore, it is good to present the expansion plans concerning the factors mentioned above.
2013年和2019年KRG GRID网络不同年份的比较
近几十年来,伊拉克库尔德斯坦地区的国家电网基础设施建设取得了长足的发展。本文的目的是展示两个不同年份的电力网络的差异,以及能源消费需求是如何逐渐增加的。增长包括发电、输电线路、变电站和负载需求。此外,最好提出考虑上述因素的扩展计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信