Under frequency load shedding threats in island operation

Václav Mužik, Z. Vostracký
{"title":"Under frequency load shedding threats in island operation","authors":"Václav Mužik, Z. Vostracký","doi":"10.1109/EPE.2017.7967317","DOIUrl":null,"url":null,"abstract":"Island operation possibility plays nowadays an important role in the view of preserving a part of the power system working during close-to-blackout emergency states such as collapsing power system divided in to smaller parts. Unfortunately following paper shows that not all regulation tools available for the transmission system operator (TSO) which are secured by the national grid code might be used during the island operation (respectively speed control mode of the power sources) for the same purpose of preventing frequency collapse. Under Frequency Load Shedding (ULFS) might cause an automatic disconnection of the working power station. This topic is demonstrated on an example system (city of Pilsen) on reality based input data. In the end the question of further research and solutions are discussed.","PeriodicalId":201464,"journal":{"name":"2017 18th International Scientific Conference on Electric Power Engineering (EPE)","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 18th International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE.2017.7967317","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Island operation possibility plays nowadays an important role in the view of preserving a part of the power system working during close-to-blackout emergency states such as collapsing power system divided in to smaller parts. Unfortunately following paper shows that not all regulation tools available for the transmission system operator (TSO) which are secured by the national grid code might be used during the island operation (respectively speed control mode of the power sources) for the same purpose of preventing frequency collapse. Under Frequency Load Shedding (ULFS) might cause an automatic disconnection of the working power station. This topic is demonstrated on an example system (city of Pilsen) on reality based input data. In the end the question of further research and solutions are discussed.
孤岛运行频率下的减载威胁
孤岛运行的可能性对于在接近停电的紧急状态下,如崩溃的电力系统被分割成更小的部分时,保留一部分电力系统的运行具有重要的作用。不幸的是,下面的文章表明,并不是所有受国家电网法规保护的输电系统运营商(TSO)可用的调节工具都可以在孤岛运行期间(分别是电源的速度控制模式)用于防止频率崩溃的相同目的。低频减载(ULFS)可能导致正在工作的电站自动断电。本课题在一个基于现实输入数据的示例系统(皮尔森市)上进行了演示。最后对有待进一步研究的问题和解决方案进行了讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信