ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA

Cepi Maulana, Saihul Anwar
{"title":"ANALYSIS OF THE CONSTRUCTION MANAGEMENT OF THE DEVELOPMENT PROJECT BOARDING HOUSE IN TEGAL PARANG, SOUTH JAKARTA","authors":"Cepi Maulana, Saihul Anwar","doi":"10.33603/JGST.V2I2.1286","DOIUrl":null,"url":null,"abstract":"Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM ( Critical Path Method ) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.","PeriodicalId":419103,"journal":{"name":"Journal of Green Science and Technology","volume":"2012 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Green Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33603/JGST.V2I2.1286","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans. This thesis specifically discuss how project management planning the construction of a Boarding house Tegal parang, South Jakarta. The research was conducted by means of a survey into the field and study of literature. This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM ( Critical Path Method ) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float. Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
南雅加达合法街开发项目公寓施工管理分析
项目管理是所有的计划,实施,控制和协调一个项目从早期(想法)到项目结束,以确保项目适当的时间,金钱和质量。选择方法调度项目也是一个很重要的注意事项,以获得符合原计划的结果。本文具体论述了如何对南雅加达的一所公寓进行项目管理规划。这项研究是通过实地调查和文献研究的方式进行的。本文的分析包括体积计算,劳动力,材料和设备的需求,条形图,现金流,S曲线,关键路径法(CPM)是一种识别关键工作路径或项目的方法。向前计算,向后计算,自由浮动和总浮动。关键词:项目管理,条形图,S曲线,关键路径法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信