INVESTMENT RISK OF SOLO-NGAWI TOLL ROAD

CI-TECH Pub Date : 2021-04-30 DOI:10.33005/ci-tech.v2i01.28
Zaid Dzulkarnain Zubizaretta, Rudy Hermawan Karsaman, R. Sony Sulaksono Wibowo
{"title":"INVESTMENT RISK OF SOLO-NGAWI TOLL ROAD","authors":"Zaid Dzulkarnain Zubizaretta, Rudy Hermawan Karsaman, R. Sony Sulaksono Wibowo","doi":"10.33005/ci-tech.v2i01.28","DOIUrl":null,"url":null,"abstract":"\n \n \n \nIn investing, there is definitely a risk, as well as the concession of toll roads. Risk analysis is used to anticipate losses due to an element of risk at each investment stage. The results of the analysis show that the highest risk probability for the Solo-Ngawi toll road is land availability and the influence of weather during development and the highest risk impacts are land availability, the potential for revolution in state governance. Based on the results of the analysis, the investment risk level of the Ngawi Solo Toll Road is included in the moderate risk category, so there is a need for cooperation in risk assurance by the Insurance Agency so that the risk level can be reduced to be lower than before.  \n \n \n \n","PeriodicalId":265863,"journal":{"name":"CI-TECH","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"CI-TECH","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33005/ci-tech.v2i01.28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In investing, there is definitely a risk, as well as the concession of toll roads. Risk analysis is used to anticipate losses due to an element of risk at each investment stage. The results of the analysis show that the highest risk probability for the Solo-Ngawi toll road is land availability and the influence of weather during development and the highest risk impacts are land availability, the potential for revolution in state governance. Based on the results of the analysis, the investment risk level of the Ngawi Solo Toll Road is included in the moderate risk category, so there is a need for cooperation in risk assurance by the Insurance Agency so that the risk level can be reduced to be lower than before. 
索罗-恩加威收费公路的投资风险
在投资方面,肯定有风险,还有收费公路的特许经营权。风险分析用于预测在每个投资阶段由于风险因素而造成的损失。分析结果表明,Solo-Ngawi收费公路的最高风险概率是土地可用性和开发期间天气的影响,最高风险影响是土地可用性,国家治理革命的潜力。根据分析结果,Ngawi Solo收费公路的投资风险级别属于中等风险类别,因此需要保险机构在风险保障方面进行合作,从而将风险级别降低到低于之前的水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信