Environmental impact assessment

M. T. Hossain
{"title":"Environmental impact assessment","authors":"M. T. Hossain","doi":"10.2166/9781780409528_0567","DOIUrl":null,"url":null,"abstract":"The development objective of the Enhancement and Strengthening of Power Transmission Network in Eastern Region Project is to increase transmission capacity and reliability of the grid network in the eastern region. Some of the negative impacts are includes : (i) noise pollution due to construction activities, generators and construction vehicle movement; (ii) air pollution and dust generation due to construction activities, generators and construction vehicle movement; (iii) traffic congestion and road accident due to movement of construction vehicles; (iv) pollution due to wastes (construction wastes from construction activities & general wastes from workers’ camps); (v) health and safety risks of construction workers; (vi) drainage congestion will be occurred in the surface drains within the substation area if OM (vii) due to adequate reliability of power supply, social life and economic condition of the people will be improved; (viii) water of nearby pond will be polluted in case of dumping of project wastes into pond and washing of project vehicles; (ix) nearby pond water will be polluted in case of dumping of project wastes into the pond and washing of project vehicles; Some of the mitigation measures are includes : (i) specific training will be focused on minimizing dust and exhaust gas emissions from heavy construction vehicles. Drivers of vehicles used during construction will be under strict instructions to minimize unnecessary trips and minimize idling of engines. Dust suppression facilities (back pack water sprayer) shall be available where earth and cement works are required; (ii) regulate use of horns and avoid use of hydraulic horns in project vehicles; (iii) engage flagman specially at the entry of the substation sites and construction camps for traffic control; (iv) solid wastes collection system will be essential, which should include separation and collection of solid wastes in the dustbins/waste containers throughout the work site, construction yard/labour camp; (v) safety signs, health signs, prohibition sign, warning sign, mandatory sign, emergency escape sign, first-aid sign, information sign, signboard, supplementary signboard, safety collar, symbol, pictogram, illuminated sign, acoustic signal, verbal communication and hand signal must be fitted at the designated sites of the subproject areas; (vi) clean the drains, specially during monsoon regularly; (vii) ensure security of substation in collaboration with law enforcing agencies; (viii) all project vehicles must be washed in the designated project garage but not in the nearby pond; (ix) plantation of minimum 272 saplings to replace felled trees on the side slopes of the access roads during monsoon period.","PeriodicalId":375583,"journal":{"name":"Mathematical Modelling and Computer Simulation of Activated Sludge Systems","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Modelling and Computer Simulation of Activated Sludge Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/9781780409528_0567","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The development objective of the Enhancement and Strengthening of Power Transmission Network in Eastern Region Project is to increase transmission capacity and reliability of the grid network in the eastern region. Some of the negative impacts are includes : (i) noise pollution due to construction activities, generators and construction vehicle movement; (ii) air pollution and dust generation due to construction activities, generators and construction vehicle movement; (iii) traffic congestion and road accident due to movement of construction vehicles; (iv) pollution due to wastes (construction wastes from construction activities & general wastes from workers’ camps); (v) health and safety risks of construction workers; (vi) drainage congestion will be occurred in the surface drains within the substation area if OM (vii) due to adequate reliability of power supply, social life and economic condition of the people will be improved; (viii) water of nearby pond will be polluted in case of dumping of project wastes into pond and washing of project vehicles; (ix) nearby pond water will be polluted in case of dumping of project wastes into the pond and washing of project vehicles; Some of the mitigation measures are includes : (i) specific training will be focused on minimizing dust and exhaust gas emissions from heavy construction vehicles. Drivers of vehicles used during construction will be under strict instructions to minimize unnecessary trips and minimize idling of engines. Dust suppression facilities (back pack water sprayer) shall be available where earth and cement works are required; (ii) regulate use of horns and avoid use of hydraulic horns in project vehicles; (iii) engage flagman specially at the entry of the substation sites and construction camps for traffic control; (iv) solid wastes collection system will be essential, which should include separation and collection of solid wastes in the dustbins/waste containers throughout the work site, construction yard/labour camp; (v) safety signs, health signs, prohibition sign, warning sign, mandatory sign, emergency escape sign, first-aid sign, information sign, signboard, supplementary signboard, safety collar, symbol, pictogram, illuminated sign, acoustic signal, verbal communication and hand signal must be fitted at the designated sites of the subproject areas; (vi) clean the drains, specially during monsoon regularly; (vii) ensure security of substation in collaboration with law enforcing agencies; (viii) all project vehicles must be washed in the designated project garage but not in the nearby pond; (ix) plantation of minimum 272 saplings to replace felled trees on the side slopes of the access roads during monsoon period.
环境影响评价
东部地区输电网增强工程的发展目标是提高东部地区电网的输电能力和可靠性。一些负面影响包括:(i)建筑活动、发电机和施工车辆移动造成的噪音污染;(二)施工活动、发电机和施工车辆运行造成的大气污染和扬尘;(三)施工车辆移动造成的交通挤塞和道路事故;(四)废物污染(建筑活动产生的建筑废物和工人营地产生的一般废物);(v)建筑工人的健康和安全风险;(vii)若供电足够可靠,可改善市民的社会生活及经济状况,则变电所范围内的地表渠会出现排水拥塞;(八)向池内倾倒工程废物、清洗工程车辆,将污染附近池水的;(九)向池内倾倒项目废弃物、清洗项目车辆,将污染池水的;一些缓解措施包括:(i)具体培训将侧重于尽量减少重型建筑车辆的粉尘和废气排放。施工期间使用车辆的司机将受到严格的指导,以尽量减少不必要的行程和尽量减少发动机空转。需要进行土方和水泥工程的地方应配备抑尘设施(背负式洒水机);(ii)规管工程车辆使用喇叭及避免使用液压喇叭;(三)在变电所场址和营区入口处安排专门的旗手进行交通管制;(iv)必须有固体废物收集系统,其中应包括在整个工地、建筑场地/劳改营的垃圾桶/废物容器中分类和收集固体废物;(五)在子项目区域的指定地点必须设置安全标志、卫生标志、禁止标志、警告标志、强制标志、紧急逃生标志、急救标志、信息标志、招牌、补充招牌、安全领、符号、象形文字、照明标志、声信号、言语和手势;(vi)定期清理排水沟,特别是在季风季节;与执法机构合作,确保变电站的安全;(viii)所有工程车辆必须在指定的工程车库内清洗,但不得在附近的池塘内清洗;(ix)在雨季期间种植最少272棵树苗,以取代在通道斜坡上被砍伐的树木。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信