{"title":"Real-time job scheduling in hypercube systems","authors":"O-Hoon Kwon, Jong Kim, S. Hong, Sunggu Lee","doi":"10.1109/ICPP.1997.622581","DOIUrl":null,"url":null,"abstract":"In this paper, we present the problem of scheduling real-time jobs in a hypercube system and propose a scheduling algorithm. The goals of the proposed scheduling algorithm are to determine whether all jobs can complete their processing before their fixed deadlines in a hypercube system and to find such a schedule. Each job is associated with a computation time, a deadline, and a dimensional requirement. Determining a schedule such that all jobs meet before their respective fixed deadlines in a hypercube system when preemption is not allowed is an NP-complete problem. Hence, we present a heuristic scheduling algorithm for scheduling non-preemptable real-time jobs in a hypercube system. Finally, we evaluate the proposed algorithm using simulation.","PeriodicalId":221761,"journal":{"name":"Proceedings of the 1997 International Conference on Parallel Processing (Cat. No.97TB100162)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1997 International Conference on Parallel Processing (Cat. No.97TB100162)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPP.1997.622581","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13
Abstract
In this paper, we present the problem of scheduling real-time jobs in a hypercube system and propose a scheduling algorithm. The goals of the proposed scheduling algorithm are to determine whether all jobs can complete their processing before their fixed deadlines in a hypercube system and to find such a schedule. Each job is associated with a computation time, a deadline, and a dimensional requirement. Determining a schedule such that all jobs meet before their respective fixed deadlines in a hypercube system when preemption is not allowed is an NP-complete problem. Hence, we present a heuristic scheduling algorithm for scheduling non-preemptable real-time jobs in a hypercube system. Finally, we evaluate the proposed algorithm using simulation.