{"title":"Mapping of lamtoro field in supporting the co-firing of steam power plants program","authors":"Y. Mohamad, Sardi Salim, L. M. K. Amali, Abdi Gunawan Djafar","doi":"10.11591/ijape.v12.i1.pp37-48","DOIUrl":null,"url":null,"abstract":"The policy of renewable energy in Indonesia is expressed in the government regulation no. 79 in 2014 regarding the national energy policy. In the document, renewable energy is targeted to reach 23% in 2025, and a minimum of 31% in 2050. One of the developed renewable energies is biomass which is produced by lamtoro, a plant which has been employed as a mixture in coal at Anggrek steam power plant 2×25 MW Gorontalo. As much of 1% to 5% of lamtoro is added in 1,000 ton of coal per day. The research aims to create a thematic map of the distribution of lamtoro to meet the need of co-firing at Anggrek steam power plant. The result of research shows the total area of field which has been planted with lamtoro is 69,074 ha, scattered in 14 districts. Meanwhile the largest area is Kabila Bone district (22,070 ha), and the smallest area is East Bulango district (0.228 ha). The estimated potential of lamtoro in 14 districts of Bone Bolango regency is about 916,439.86 ton/ha/year.","PeriodicalId":340072,"journal":{"name":"International Journal of Applied Power Engineering (IJAPE)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Applied Power Engineering (IJAPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11591/ijape.v12.i1.pp37-48","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The policy of renewable energy in Indonesia is expressed in the government regulation no. 79 in 2014 regarding the national energy policy. In the document, renewable energy is targeted to reach 23% in 2025, and a minimum of 31% in 2050. One of the developed renewable energies is biomass which is produced by lamtoro, a plant which has been employed as a mixture in coal at Anggrek steam power plant 2×25 MW Gorontalo. As much of 1% to 5% of lamtoro is added in 1,000 ton of coal per day. The research aims to create a thematic map of the distribution of lamtoro to meet the need of co-firing at Anggrek steam power plant. The result of research shows the total area of field which has been planted with lamtoro is 69,074 ha, scattered in 14 districts. Meanwhile the largest area is Kabila Bone district (22,070 ha), and the smallest area is East Bulango district (0.228 ha). The estimated potential of lamtoro in 14 districts of Bone Bolango regency is about 916,439.86 ton/ha/year.
绘图的lamtoro领域在支持共烧蒸汽发电厂的方案
印尼的可再生能源政策体现在政府法规no。2014年第79号关于国家能源政策的意见。在这份文件中,可再生能源的目标是到2025年达到23%,到2050年至少达到31%。其中一种已开发的可再生能源是lamtoro生产的生物质,该工厂已被Anggrek蒸汽发电厂2×25 MW Gorontalo用作煤的混合物。每天1000吨煤中会添加1%到5%的拉托罗。本研究旨在建立一个lamtoro分布的专题地图,以满足Anggrek蒸汽发电厂共烧的需要。研究结果表明,目前已种植兰托罗的总面积为69074公顷,分布在14个地区。同时,面积最大的是卡比拉邦尼区(22,070公顷),面积最小的是东布兰戈区(0.228公顷)。Bone Bolango县14个地区的lamtoro估计潜力约为916,439.86吨/公顷/年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信