{"title":"Low ceremony processes for short lifecycle projects (keynote)","authors":"A. Wasserman","doi":"10.1145/2486046.2486049","DOIUrl":null,"url":null,"abstract":"This paper is a summary of the author’s keynote talk describing suitable approaches for software projects with small teams (including a single individual) and release cycles in days or weeks rather than in years. Traditional processes used for larger projects have significant shortcomings in smaller projects, particularly the need to devote a significant portion of the overall effort to the process itself.","PeriodicalId":296714,"journal":{"name":"International Conference on Software and Systems Process","volume":"144 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software and Systems Process","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/2486046.2486049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10
Abstract
This paper is a summary of the author’s keynote talk describing suitable approaches for software projects with small teams (including a single individual) and release cycles in days or weeks rather than in years. Traditional processes used for larger projects have significant shortcomings in smaller projects, particularly the need to devote a significant portion of the overall effort to the process itself.