Analisa Perbandingan Volume dan Biaya Bar Bending Schedule dengan Metode SNI-2847:2013 dan BS 8666:2005 (Studi Kasus: Proyek Pembangunan Kantor Pacto, Denpasar-Bali)

Made Widya Jayantari, Putu Surya Triana Dewi, Putu Gede Anggara Yoga
{"title":"Analisa Perbandingan Volume dan Biaya Bar Bending Schedule dengan Metode SNI-2847:2013 dan BS 8666:2005 (Studi Kasus: Proyek Pembangunan Kantor Pacto, Denpasar-Bali)","authors":"Made Widya Jayantari, Putu Surya Triana Dewi, Putu Gede Anggara Yoga","doi":"10.38043/reinforcement.v1i2.4102","DOIUrl":null,"url":null,"abstract":"The success of construction projects, especially in the construction of multi-storey buildings is influenced by material components. Therefore, optimizing material planning is important to do. In the Pacto Sanur Building construction project, optimization of material planning is viewed from the ironing work because it costs a relatively large amount compared to other works. The purpose of this study is to analyze the comparison of bar bending schedules on projects using the British Standard 8666:2005 and SNI-2847:2013 methods, then to identify project cost comparisons. From the results of the identification of iron planning using the SNI-2847:2013 method, it can be seen that the weight of Ø16 iron = 3971.00 kg, the weight of Ø13 iron = 251.51 kg, and the weight of Ø10 iron = 7034.38 kg. Furthermore, in the identification of repair plans using the British Standard 8666:2005 method, it can be seen that the weight of iron Ø16 = 42153.22 kg, the weight of iron Ø13 = 280.95 kg, and the weight of iron Ø10 = 7343.58 kg. The volume optimization for Sloof, Beams, Columns, and Floor Plates II uses the British Standard 8666: 2005 method of 47% with the total cost of the SNI-2847:2013 method ironwork Rp. 202,623,928 and the total cost of repair work using the British Standard 8666:2005 method is Rp. 213,799,435.","PeriodicalId":205435,"journal":{"name":"Reinforcement Review in Civil Engineering Studies and Management","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Reinforcement Review in Civil Engineering Studies and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.38043/reinforcement.v1i2.4102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The success of construction projects, especially in the construction of multi-storey buildings is influenced by material components. Therefore, optimizing material planning is important to do. In the Pacto Sanur Building construction project, optimization of material planning is viewed from the ironing work because it costs a relatively large amount compared to other works. The purpose of this study is to analyze the comparison of bar bending schedules on projects using the British Standard 8666:2005 and SNI-2847:2013 methods, then to identify project cost comparisons. From the results of the identification of iron planning using the SNI-2847:2013 method, it can be seen that the weight of Ø16 iron = 3971.00 kg, the weight of Ø13 iron = 251.51 kg, and the weight of Ø10 iron = 7034.38 kg. Furthermore, in the identification of repair plans using the British Standard 8666:2005 method, it can be seen that the weight of iron Ø16 = 42153.22 kg, the weight of iron Ø13 = 280.95 kg, and the weight of iron Ø10 = 7343.58 kg. The volume optimization for Sloof, Beams, Columns, and Floor Plates II uses the British Standard 8666: 2005 method of 47% with the total cost of the SNI-2847:2013 method ironwork Rp. 202,623,928 and the total cost of repair work using the British Standard 8666:2005 method is Rp. 213,799,435.
分析音量比较表与模式sa - 2847:23 13和BS 8666005(案例研究:Pacto office建设项目,Denpasar-Bali)
建筑工程的成败,尤其是多层建筑的成败,都受到材料成分的影响。因此,优化物料计划是很重要的。在Pacto Sanur Building施工项目中,由于熨烫工作的成本相对其他工作来说比较大,所以从熨烫工作的角度来考虑材料规划的优化。本研究的目的是使用英国标准8666:2005和SNI-2847:2013方法分析项目中棒材弯曲时间表的比较,然后确定项目成本比较。从采用SNI-2847:2013方法鉴定铁规划的结果可以看出,Ø16铁的重量= 3971.00 kg, Ø13铁的重量= 251.51 kg, Ø10铁的重量= 7034.38 kg。此外,在使用英国标准8666:2005方法进行修理方案的识别时,可以看到铁的重量Ø16 = 42153.22 kg,铁的重量Ø13 = 280.95 kg,铁的重量Ø10 = 7343.58 kg。槽板、梁、柱和楼板II的体积优化采用英国标准8666:2005方法,总成本为47%,sn -2847:2013方法的总成本为Rp. 202,623,928,使用英国标准8666:2005方法的维修工作总成本为Rp. 213,799,435。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信