Refreshing Extension of the Operation of High Pressure Rotors and Average Pressure Rotors of the Turbine K-200-130 at the Kurakhovska Heat Power Plant

O. Chernousenko, D. Rindyuk, V. Peshko
{"title":"Refreshing Extension of the Operation of High Pressure Rotors and Average Pressure Rotors of the Turbine K-200-130 at the Kurakhovska Heat Power Plant","authors":"O. Chernousenko, D. Rindyuk, V. Peshko","doi":"10.20998/2078-774x.2018.12.07","DOIUrl":null,"url":null,"abstract":"The power-generating units at the Kurakhovska Heat Power Plant of 200MW with steam turbines K-200-130 that reached their fleet life require today the decision taking on the possibility of their further operation. In this connection, the problems of taking into consideration the damages caused by the action of high local temperatures, the local temperature nonuniformity and a reliable estimation of the residual life of rotors is vital. Based on the developed methods of calculated estimate of the action of local nonuniformity of heat losses we computed the residual life of HP and AP rotors of the steam turbine K-200-130-3. The elastically deformed rotor state was calculated taking into account the joint action of the temperature gradient, centrifugal forces and steam-pressure in operation. A total level of damage of the metal of HPR and APR was defined based on the computations of the low-cycle fatigue and the static damageability. The recommendations were given on the opportunity for the refreshing extension of the service life of high pressure rotors and low pressure rotors of the steam turbine of 200 MW used for the power-generating units No 4 and No 5 at Kurakhovska heat power plant, exceeding their fleet life stated in current normative documents. High pressure rotors and low-pressure rotors of the power-generating unit No 4 at Kurakhovska heat power plant can operate for additional 45 thousand hours and the power-generating unit No 5 can additionally operate during 50 thousand hours. Key words: average pressure rotor, high pressure rotor, cold start-up, warm start-up, hot start-up, residual life, low-cycle fatigue and the long-term strength.","PeriodicalId":416126,"journal":{"name":"NTU \"KhPI\" Bulletin: Power and heat engineering processes and equipment","volume":"167 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"NTU \"KhPI\" Bulletin: Power and heat engineering processes and equipment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20998/2078-774x.2018.12.07","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The power-generating units at the Kurakhovska Heat Power Plant of 200MW with steam turbines K-200-130 that reached their fleet life require today the decision taking on the possibility of their further operation. In this connection, the problems of taking into consideration the damages caused by the action of high local temperatures, the local temperature nonuniformity and a reliable estimation of the residual life of rotors is vital. Based on the developed methods of calculated estimate of the action of local nonuniformity of heat losses we computed the residual life of HP and AP rotors of the steam turbine K-200-130-3. The elastically deformed rotor state was calculated taking into account the joint action of the temperature gradient, centrifugal forces and steam-pressure in operation. A total level of damage of the metal of HPR and APR was defined based on the computations of the low-cycle fatigue and the static damageability. The recommendations were given on the opportunity for the refreshing extension of the service life of high pressure rotors and low pressure rotors of the steam turbine of 200 MW used for the power-generating units No 4 and No 5 at Kurakhovska heat power plant, exceeding their fleet life stated in current normative documents. High pressure rotors and low-pressure rotors of the power-generating unit No 4 at Kurakhovska heat power plant can operate for additional 45 thousand hours and the power-generating unit No 5 can additionally operate during 50 thousand hours. Key words: average pressure rotor, high pressure rotor, cold start-up, warm start-up, hot start-up, residual life, low-cycle fatigue and the long-term strength.
库拉霍夫斯卡热电厂K-200-130汽轮机高压转子和平均压力转子运行的更新延长
库拉霍夫斯卡热电厂200兆瓦蒸汽轮机K-200-130的发电机组已达到其机组寿命,今天需要决定是否继续运行。因此,考虑局部高温作用下的损伤、局部温度的不均匀性以及转子剩余寿命的可靠估计是至关重要的。根据现有的热损失局部不均匀性作用的计算估计方法,计算了K-200-130-3汽轮机高压转子和低压转子的剩余寿命。考虑了运行中温度梯度、离心力和蒸汽压力的共同作用,计算了转子的弹性变形状态。通过低周疲劳和静力损伤计算,确定了HPR和APR材料的总损伤等级。这些建议是关于库拉霍夫斯卡热电厂4号和5号发电机组使用的200兆瓦汽轮机的高压转子和低压转子的使用寿命的更新延长的机会,超过了现行规范文件中规定的机组寿命。库拉霍夫斯卡热电厂4号机组高压转子和低压转子可额外运行4.5万小时,5号机组可额外运行5万小时。关键词:均压转子、高压转子、冷启动、热启动、剩余寿命、低周疲劳、长期强度
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信