TBM tunnelling under the Suez Canal – Port Said tunnels in challenging ground conditions

Dimitrios V. Rizos, D. Williams, A. Fouda, T. Amin, Mohamed Aboudshiesh, Anis Dimitry Nicola
{"title":"TBM tunnelling under the Suez Canal – Port Said tunnels in challenging ground conditions","authors":"Dimitrios V. Rizos, D. Williams, A. Fouda, T. Amin, Mohamed Aboudshiesh, Anis Dimitry Nicola","doi":"10.1002/geot.201700063","DOIUrl":null,"url":null,"abstract":"The Port Said Tunnels Project consists of twin road tunnels crossing the Suez Canal with a planned capacity of 2,100 mixed vehicles/hour in each direction. The dual carriageway tunnels are an important part of the Suez Canal Region Development Plan, which will connect the Sinai with other Egyptian provinces to provide a gateway for investment opportunities and speed up the development of Sinai province. The project is located 19 km south of Port Said city, near the northern entrance of the Suez Canal. The tunnels are constructed using slurry shield TBMs in difficult ground conditions, including the presence of methane gas. This paper demonstrates the main challenges encountered during tunnelling and the measures taken to mitigate potential risks during construction and to control long‐term differential settlements in the upper, very soft soil. The tunnels are connected by two cross passages which are being constructed using ground freezing and conventional tunnelling.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201700063","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Port Said Tunnels Project consists of twin road tunnels crossing the Suez Canal with a planned capacity of 2,100 mixed vehicles/hour in each direction. The dual carriageway tunnels are an important part of the Suez Canal Region Development Plan, which will connect the Sinai with other Egyptian provinces to provide a gateway for investment opportunities and speed up the development of Sinai province. The project is located 19 km south of Port Said city, near the northern entrance of the Suez Canal. The tunnels are constructed using slurry shield TBMs in difficult ground conditions, including the presence of methane gas. This paper demonstrates the main challenges encountered during tunnelling and the measures taken to mitigate potential risks during construction and to control long‐term differential settlements in the upper, very soft soil. The tunnels are connected by two cross passages which are being constructed using ground freezing and conventional tunnelling.
苏伊士运河下的隧道掘进机-塞得港隧道在具有挑战性的地面条件下
塞得港隧道项目由两条穿越苏伊士运河的公路隧道组成,每个方向的计划通行能力为每小时2,100辆混合车辆。双行车道隧道是苏伊士运河地区发展计划的重要组成部分,它将把西奈与埃及其他省份连接起来,为投资机会提供门户,加快西奈省的发展。该项目位于塞得港以南19公里处,靠近苏伊士运河北部入口。这些隧道使用泥浆盾构掘进机在困难的地面条件下建造,包括存在甲烷气体。本文阐述了隧道施工过程中遇到的主要挑战,以及在施工过程中采取的措施,以减轻施工过程中的潜在风险,并控制上部极软土壤的长期差异沉降。隧道由两条交叉通道连接,这两条通道正在使用地面冻结和传统隧道施工。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信