Clock period optimization technique using multiple clocking domains

I. Nesamani, K. Priyadarshini, A. Devi, V. Prabha
{"title":"Clock period optimization technique using multiple clocking domains","authors":"I. Nesamani, K. Priyadarshini, A. Devi, V. Prabha","doi":"10.1109/ICECTECH.2011.5941915","DOIUrl":null,"url":null,"abstract":"The concept of unconstrained clock skew scheduling (CSS) is practically limited due to the difficulties in implementing dedicated clock delays in a reliable manner. This results in a significant limitation of the optimization potential. As an alternative the application of multiple clocking domains with dedicated clock buffer will be implemented. In this paper, an algorithm is proposed for determining the minimum number of clock domains to be used for multi domain clock skew scheduling. The concept of multi domain clock skew scheduling is implemented on the bench mark circuit and the same is applied to digital logic circuit of the telephone answering machine.","PeriodicalId":184011,"journal":{"name":"2011 3rd International Conference on Electronics Computer Technology","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 3rd International Conference on Electronics Computer Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICECTECH.2011.5941915","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The concept of unconstrained clock skew scheduling (CSS) is practically limited due to the difficulties in implementing dedicated clock delays in a reliable manner. This results in a significant limitation of the optimization potential. As an alternative the application of multiple clocking domains with dedicated clock buffer will be implemented. In this paper, an algorithm is proposed for determining the minimum number of clock domains to be used for multi domain clock skew scheduling. The concept of multi domain clock skew scheduling is implemented on the bench mark circuit and the same is applied to digital logic circuit of the telephone answering machine.
使用多个时钟域的时钟周期优化技术
由于难以以可靠的方式实现专用时钟延迟,无约束时钟倾斜调度(CSS)的概念实际上受到限制。这导致了优化潜力的显著限制。作为一种替代方案,将实现具有专用时钟缓冲区的多个时钟域的应用。本文提出了一种确定用于多域时钟偏差调度的最小时钟域数的算法。在基准电路上实现了多域时钟偏差调度的概念,并将其应用于电话应答机的数字逻辑电路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信