Project Construction Modularization Assessment

M. Abdellatif
{"title":"Project Construction Modularization Assessment","authors":"M. Abdellatif","doi":"10.2118/198626-ms","DOIUrl":null,"url":null,"abstract":"The decision to use Modularization Vs Stick Built for project execution must be subject to proper assessment followed by Constructability Assessment to decide on the best way forward.\n The Construction Modularization Assessment is the best process to decide. This exercise must be carried out during FEED taking into consideration the geographic site location, resource availability, logistics, constraints and limitations. The outcome of this exercise will determine the feasibility of modularization and estimate the number, type and weight of each module.\n The build sequence is an important factor linked to this exercise and must be carefully studied to provide a clear plan linked to the estimated delivery dates of material and equipment with special attention to long delivery items in addition to assessing the risk of delays and provide alternative module installation sequence.\n Conducting such assessment during FEED will have a major impact on Project successful delivery since it will provide the EPC Tenderers with clear methodology for fabrication and installation, however this assessment and proposed modularization scheme can always be modified by the EPC Contractor to suit his capabilities and resources.\n Also, it worth highlighting that the assessment will identify the associated risks which will help the Contractor to be very competitive in his bid.\n This paper is based mainly on lessons learned from implemented major onshore and offshore projects and accordingly reflects a practical approach which can be adopted for future projects.\n It is to be noted that such assessment is not part of the standard formal reviews carried out by companies during FEED and mostly left to EPC Contractor to decide.","PeriodicalId":182237,"journal":{"name":"Day 3 Wed, October 23, 2019","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, October 23, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198626-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The decision to use Modularization Vs Stick Built for project execution must be subject to proper assessment followed by Constructability Assessment to decide on the best way forward. The Construction Modularization Assessment is the best process to decide. This exercise must be carried out during FEED taking into consideration the geographic site location, resource availability, logistics, constraints and limitations. The outcome of this exercise will determine the feasibility of modularization and estimate the number, type and weight of each module. The build sequence is an important factor linked to this exercise and must be carefully studied to provide a clear plan linked to the estimated delivery dates of material and equipment with special attention to long delivery items in addition to assessing the risk of delays and provide alternative module installation sequence. Conducting such assessment during FEED will have a major impact on Project successful delivery since it will provide the EPC Tenderers with clear methodology for fabrication and installation, however this assessment and proposed modularization scheme can always be modified by the EPC Contractor to suit his capabilities and resources. Also, it worth highlighting that the assessment will identify the associated risks which will help the Contractor to be very competitive in his bid. This paper is based mainly on lessons learned from implemented major onshore and offshore projects and accordingly reflects a practical approach which can be adopted for future projects. It is to be noted that such assessment is not part of the standard formal reviews carried out by companies during FEED and mostly left to EPC Contractor to decide.
项目建设模块化评估
在项目执行中使用模块化还是坚持建造的决定必须经过适当的评估,然后进行可建造性评估,以确定最佳的前进方向。建筑模块化评价是最佳的决策过程。这项工作必须在FEED期间进行,同时考虑到地理位置、资源供应、后勤、限制和限制。这项工作的结果将确定模块化的可行性,并估计每个模块的数量、类型和权重。构建顺序是与此演习相关的一个重要因素,必须仔细研究,以提供与材料和设备的预计交付日期相关的清晰计划,除了评估延迟风险外,还要特别注意长交付项目,并提供可选择的模块安装顺序。在FEED期间进行此类评估将对项目的成功交付产生重大影响,因为它将为EPC投标人提供明确的制造和安装方法,但是EPC承包商可以随时修改此评估和拟议的模块化方案,以适应其能力和资源。此外,值得强调的是,评估将确定相关风险,这将有助于承包商在其投标中具有很强的竞争力。本文主要基于从实施的主要陆上和海上项目中吸取的经验教训,因此反映了一种可用于未来项目的实用方法。值得注意的是,这种评估不是公司在FEED期间进行的标准正式审查的一部分,主要由EPC承包商决定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信