{"title":"Hydro Generation Scheduling Using Refined Genetic Algorithm","authors":"Po-Hung Chen, C. Kuo, Hsin-Fu Lee, Cheng-Chuan Chen","doi":"10.1109/ISDEA.2012.535","DOIUrl":null,"url":null,"abstract":"This paper presents a novel solution algorithm based on a refined genetic algorithm for solving the hydro generation scheduling problem. In this work, complete solution algorithms and encoding/decoding techniques are proposed for solving different types of hydro plants involving hydraulically independent plants, hydraulically coupled plants, and pump-storage plants. In the proposed approach, the hydraulically coupled plants which are located on the same river are solved concurrently as a multi-plant scheduling problem rather than as several single-plant scheduling problems in sequence. The difficult water balance constraints caused by hydraulic coupling are embedded and satisfied throughout the proposed encoding and decoding algorithm. The proposed approach is applied with great success to the actual Taipower system, which consists of two hydraulically independent plants, three hydraulically coupled plants, four pump-storage plants, and 34 thermal units.","PeriodicalId":267532,"journal":{"name":"2012 Second International Conference on Intelligent System Design and Engineering Application","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-01-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Second International Conference on Intelligent System Design and Engineering Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISDEA.2012.535","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper presents a novel solution algorithm based on a refined genetic algorithm for solving the hydro generation scheduling problem. In this work, complete solution algorithms and encoding/decoding techniques are proposed for solving different types of hydro plants involving hydraulically independent plants, hydraulically coupled plants, and pump-storage plants. In the proposed approach, the hydraulically coupled plants which are located on the same river are solved concurrently as a multi-plant scheduling problem rather than as several single-plant scheduling problems in sequence. The difficult water balance constraints caused by hydraulic coupling are embedded and satisfied throughout the proposed encoding and decoding algorithm. The proposed approach is applied with great success to the actual Taipower system, which consists of two hydraulically independent plants, three hydraulically coupled plants, four pump-storage plants, and 34 thermal units.
基于改进遗传算法的水力发电调度
提出了一种基于改进遗传算法的水力发电调度问题求解算法。本文提出了求解水力独立电站、水力耦合电站和抽水蓄能电站等不同类型水电站的完整求解算法和编解码技术。该方法将位于同一河流上的水工耦合电站作为一个多电站调度问题同时解决,而不是作为多个单电站顺序调度问题来解决。在整个编解码算法中嵌入并满足水力耦合引起的水平衡困难约束。所提出的方法在实际的台电系统中取得了巨大的成功,该系统由两个水力独立电厂、三个水力耦合电厂、四个抽水蓄能电厂和34个热力机组组成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信