Mempercepat Waktu Pelaksanaan Proyek Pembangunan Jalur Ganda Kereta Api Antara Mojokerto-Sepanjang Melalui Penjadwalan Line of Balance

Cristina Widya Ningrum, Michella Beatrix
{"title":"Mempercepat Waktu Pelaksanaan Proyek Pembangunan Jalur Ganda Kereta Api Antara Mojokerto-Sepanjang Melalui Penjadwalan Line of Balance","authors":"Cristina Widya Ningrum, Michella Beatrix","doi":"10.30737/jurmateks.v5i2.4020","DOIUrl":null,"url":null,"abstract":"In construction management, project scheduling is an important thing to note. The project schedule is a means of determining proper duration, controlling implementation progress, and allocating resources efficiently. Improper scheduling will have an impact on project delays. the project for the construction of a double track railway across the south of Java between Mojokerto-Sepanjang is planned to be completed in 60 weeks with overlapping activities due to changes in activities. This double track rail project is an ongoing project. This research aims to find out the project implementation time using the Line of Balance. The development project has a length of 3011.23 m. the Line of Balance method is carried out by determining the dependency logic, preparing a Line Of Balance schedule, drawing a Line Of Balance graph, and determining the production speed. The results of the study show that the line of balance schedule in the existing conditions has lines of intersection between jobs. The intersection indicates that there is overlapping work. For this reason, improvements are made by changing the dependency logic from work that was originally parallel to not parallel. The results of improvements made by reducing the duration per work cycle by 1 week revealed that the duration of the project could be accelerated to 38 weeks. So that the scheduling can be used to speed up the time of implementation of project activities.","PeriodicalId":173188,"journal":{"name":"Jurnal Manajemen Teknologi & Teknik Sipil","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Manajemen Teknologi & Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30737/jurmateks.v5i2.4020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In construction management, project scheduling is an important thing to note. The project schedule is a means of determining proper duration, controlling implementation progress, and allocating resources efficiently. Improper scheduling will have an impact on project delays. the project for the construction of a double track railway across the south of Java between Mojokerto-Sepanjang is planned to be completed in 60 weeks with overlapping activities due to changes in activities. This double track rail project is an ongoing project. This research aims to find out the project implementation time using the Line of Balance. The development project has a length of 3011.23 m. the Line of Balance method is carried out by determining the dependency logic, preparing a Line Of Balance schedule, drawing a Line Of Balance graph, and determining the production speed. The results of the study show that the line of balance schedule in the existing conditions has lines of intersection between jobs. The intersection indicates that there is overlapping work. For this reason, improvements are made by changing the dependency logic from work that was originally parallel to not parallel. The results of improvements made by reducing the duration per work cycle by 1 week revealed that the duration of the project could be accelerated to 38 weeks. So that the scheduling can be used to speed up the time of implementation of project activities.
通过指定的平衡线,将mojokerto - along的双轨建设项目提前完成
在施工管理中,项目调度是一个重要的注意事项。项目进度表是确定适当工期、控制实施进度和有效分配资源的一种手段。不恰当的调度会对项目的延迟产生影响。在爪哇南部Mojokerto-Sepanjang之间建造一条双轨铁路的项目计划在60周内完成,由于活动的变化,活动重叠。这个双轨铁路项目是一个正在进行的项目。本研究旨在利用平衡线找出项目实施时间。该开发项目长度为3011.23 m,采用确定依赖逻辑、编制平衡线计划、绘制平衡线图、确定生产速度的方法来实施平衡线方法。研究结果表明,线路平衡调度在现有条件下存在线路作业间的交集。交叉表示有重叠的工作。由于这个原因,改进是通过将依赖逻辑从最初的并行工作更改为非并行工作来实现的。通过将每个工作周期的持续时间减少1周所取得的改进结果表明,项目的持续时间可以加速到38周。这样就可以利用调度来加快项目活动的实施时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信