A Methodology for Determination of the Risk-Benefit Ratio of an Investment Project Based on the Volatility Rate and Integrated Indicator of the Environment Dynamics
{"title":"A Methodology for Determination of the Risk-Benefit Ratio of an Investment Project Based on the Volatility Rate and Integrated Indicator of the Environment Dynamics","authors":"M. Doroshenko","doi":"10.2991/assehr.k.201212.029","DOIUrl":null,"url":null,"abstract":": The subject of the paper is a methodology for determination of the risk-benefit ratio of an investment project. The purpose of this study is to provide investors with practical tools for assessing the numerical values of the risk-benefit ratio of an investment project based on the calculation of the volatility rate and the integrated indicator of the environment dynamics. The main result is a method of determining the risk-benefit ratio of the investment project on the basis of the volatility rate and the integrated indicator of the environment dynamics, which is advisable to use in determining the costs of investing in projects.","PeriodicalId":254916,"journal":{"name":"Proceedings of the International Conference Digital Age: Traditions, Modernity and Innovations (ICDATMI 2020)","volume":"46 ","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference Digital Age: Traditions, Modernity and Innovations (ICDATMI 2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/assehr.k.201212.029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
: The subject of the paper is a methodology for determination of the risk-benefit ratio of an investment project. The purpose of this study is to provide investors with practical tools for assessing the numerical values of the risk-benefit ratio of an investment project based on the calculation of the volatility rate and the integrated indicator of the environment dynamics. The main result is a method of determining the risk-benefit ratio of the investment project on the basis of the volatility rate and the integrated indicator of the environment dynamics, which is advisable to use in determining the costs of investing in projects.