{"title":"Short span UHPFRC railway bridge in Switzerland - from design to implementation","authors":"Ngoc Thanh Trinh, N. Bertola, Enrique García, E. Brühwiler","doi":"10.2749/prague.2022.0277","DOIUrl":null,"url":null,"abstract":"This paper presents the design and construction of the Aiguillon railway bridge in Switzerland, one of the first railway bridges completely made of Ultra-High-Performance Fiber-Reinforced Cementitious Composite (UHPFRC). The length and width of the trough girder are respectively 6.6 m and 5.7 m. It is designed for a narrow-gauge track and two walkways. The trough is composed of two prefabricated elements in UHPFRC with steel reinforcement bars. These elements are first built in the plant and then are assembled on site by a longitudinal cast-in-place joint.The challenges and the experiences in this project are discussed and analysed in view of future projects. Furthermore, the full-scale suitability tests to validate the joint between the two prefabricated elements are described. The test results of the structural resistance of the joints are in good agreement with analytical results.","PeriodicalId":168532,"journal":{"name":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","volume":"29 3","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/prague.2022.0277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents the design and construction of the Aiguillon railway bridge in Switzerland, one of the first railway bridges completely made of Ultra-High-Performance Fiber-Reinforced Cementitious Composite (UHPFRC). The length and width of the trough girder are respectively 6.6 m and 5.7 m. It is designed for a narrow-gauge track and two walkways. The trough is composed of two prefabricated elements in UHPFRC with steel reinforcement bars. These elements are first built in the plant and then are assembled on site by a longitudinal cast-in-place joint.The challenges and the experiences in this project are discussed and analysed in view of future projects. Furthermore, the full-scale suitability tests to validate the joint between the two prefabricated elements are described. The test results of the structural resistance of the joints are in good agreement with analytical results.
瑞士短跨UHPFRC铁路桥——从设计到实施
本文介绍了瑞士Aiguillon铁路桥的设计和施工,这是第一座完全由超高性能纤维增强胶凝复合材料(UHPFRC)制成的铁路桥之一。槽型梁长6.6 m,宽5.7 m。它是为窄轨轨道和两条人行道设计的。槽是由两个预制构件在UHPFRC与钢筋钢筋。这些元素首先在工厂内建造,然后通过纵向就地浇筑接缝在现场组装。针对未来的项目,讨论和分析了该项目面临的挑战和经验。此外,还描述了验证两个预制构件之间连接的全尺寸适用性试验。节点结构抗力试验结果与分析结果吻合较好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信