Resource Levelling with Float Consumption Rate

Atilla Damci, Gul Polat, Firat Akin, Harun Turkoglu
{"title":"Resource Levelling with Float Consumption Rate","authors":"Atilla Damci, Gul Polat, Firat Akin, Harun Turkoglu","doi":"10.3311/ccc2019-082","DOIUrl":null,"url":null,"abstract":"The use of an appropriate scheduling method is not sufficient in constructing a reliable schedule. The management of resources is as important as the scheduling method. Inefficiency in managing resources may bring about severe delays as well as cost overruns caused by resource shortages in some cases and/or idle resources in others. Therefore, resources should be utilized efficiently in order to prevent project failures. Resource leveling is one of the approaches that are used for the management of resources. The goal of resource leveling is to minimize fluctuations, peaks and valleys in resource utilization without changing the completion time of a project and the number of resources required. Although the main principle behind traditional resource leveling is achieving an even flow of resources while the original project duration remains unchanged, it is possible to develop a more efficient model that discriminates among the activities that are selected for participation in resource leveling. For this purpose, a model was developed that considers the float consumption rates of activities. The float consumption rate is the percentage that is set to determine the maximum amount of float which will be consumed to shift the start time of the activity. The proposed model allows the scheduler to assign float consumption rates to each activity that can be used during the resource leveling procedure. When the required information is input, the proposed model automatically changes the required daily resources as it shifts the non-critical activities along their available total float times. The proposed model is expected to minimize the likelihood of severe delay and cost overrun. The model is demonstrated on an illustrative example by constructing a network and its resource utilization histograms. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"122 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-082","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The use of an appropriate scheduling method is not sufficient in constructing a reliable schedule. The management of resources is as important as the scheduling method. Inefficiency in managing resources may bring about severe delays as well as cost overruns caused by resource shortages in some cases and/or idle resources in others. Therefore, resources should be utilized efficiently in order to prevent project failures. Resource leveling is one of the approaches that are used for the management of resources. The goal of resource leveling is to minimize fluctuations, peaks and valleys in resource utilization without changing the completion time of a project and the number of resources required. Although the main principle behind traditional resource leveling is achieving an even flow of resources while the original project duration remains unchanged, it is possible to develop a more efficient model that discriminates among the activities that are selected for participation in resource leveling. For this purpose, a model was developed that considers the float consumption rates of activities. The float consumption rate is the percentage that is set to determine the maximum amount of float which will be consumed to shift the start time of the activity. The proposed model allows the scheduler to assign float consumption rates to each activity that can be used during the resource leveling procedure. When the required information is input, the proposed model automatically changes the required daily resources as it shifts the non-critical activities along their available total float times. The proposed model is expected to minimize the likelihood of severe delay and cost overrun. The model is demonstrated on an illustrative example by constructing a network and its resource utilization histograms. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
资源水平与浮动消耗率
使用适当的调度方法是不足以构建可靠的调度的。资源的管理与调度方法同样重要。资源管理效率低下可能会造成严重的延误以及在某些情况下由于资源短缺和/或资源闲置而造成的成本超支。因此,要有效利用资源,防止项目失败。资源均衡是用于管理资源的方法之一。资源均衡的目标是在不改变项目的完成时间和所需资源数量的情况下,尽量减少资源利用率的波动、高峰和低谷。尽管传统资源均衡背后的主要原则是在原始项目持续时间保持不变的情况下实现资源的均匀流动,但有可能开发出一种更有效的模型,区分为参与资源均衡而选择的活动。为此,开发了一个考虑活动浮动消耗率的模型。浮动消耗率是设置的百分比,用于确定将被消耗的浮动的最大数量,以移动活动的开始时间。建议的模型允许调度器为资源均衡过程中可以使用的每个活动分配浮动消耗率。当输入所需的信息时,建议的模型会自动更改所需的日常资源,因为它会沿着可用的总浮动时间移动非关键活动。所提出的模式预计将最大限度地减少严重延误和成本超支的可能性。通过构建网络及其资源利用直方图,对该模型进行了实例验证。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信