Comparative investigation on hill climbing MPPT algorithms at high perturbation rates

M. Elgendy
{"title":"Comparative investigation on hill climbing MPPT algorithms at high perturbation rates","authors":"M. Elgendy","doi":"10.1109/IREC.2016.7478939","DOIUrl":null,"url":null,"abstract":"The Perturb and Observe (P&O) and the Incremental Conductance (INC) algorithms are the two most commonly employed hill-climbing maximum power point tracking (MPPT) techniques for photovoltaic (PV) systems. The comparison between the two algorithms at low perturbation rates has been the subject of a number of publications. No much attention was paid to such a comparison at high perturbation rates, when system response to MPPT perturbations is never allowed to settle, although higher energy utilization efficiency and better system performance may be achieved in this operation mode. This paper presents a comprehensive experimental and theoretical comparison between the two algorithms when operated at high perturbation rates. The experimental setup is a standalone PV system comprised of 1080Wp PV generator, MPPT controlled dc-dc converter and a dc motor-pump load.","PeriodicalId":190533,"journal":{"name":"2016 7th International Renewable Energy Congress (IREC)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 7th International Renewable Energy Congress (IREC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IREC.2016.7478939","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

Abstract

The Perturb and Observe (P&O) and the Incremental Conductance (INC) algorithms are the two most commonly employed hill-climbing maximum power point tracking (MPPT) techniques for photovoltaic (PV) systems. The comparison between the two algorithms at low perturbation rates has been the subject of a number of publications. No much attention was paid to such a comparison at high perturbation rates, when system response to MPPT perturbations is never allowed to settle, although higher energy utilization efficiency and better system performance may be achieved in this operation mode. This paper presents a comprehensive experimental and theoretical comparison between the two algorithms when operated at high perturbation rates. The experimental setup is a standalone PV system comprised of 1080Wp PV generator, MPPT controlled dc-dc converter and a dc motor-pump load.
高扰动率下爬坡MPPT算法的比较研究
扰动与观测(P&O)算法和增量电导(INC)算法是光伏系统中最常用的两种爬坡最大功率点跟踪(MPPT)技术。两种算法在低扰动率下的比较已成为许多出版物的主题。在高摄动率下,系统对MPPT摄动的响应永远不允许稳定,尽管在这种运行模式下可以获得更高的能量利用效率和更好的系统性能,但没有太多关注这种比较。本文对两种算法在高扰动率下进行了全面的实验和理论比较。实验装置是一个由1080Wp光伏发电机、MPPT控制的dc-dc变换器和直流电机-泵负载组成的独立光伏系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信