The Solar eclipse of August 21, 2017 in Honduras: Evidence of the impact on the power system operation

W. Flores, Pablo Meraz, J. Berrios, Dalton Melara, C. Barahona, Wilfredo Sifuentes
{"title":"The Solar eclipse of August 21, 2017 in Honduras: Evidence of the impact on the power system operation","authors":"W. Flores, Pablo Meraz, J. Berrios, Dalton Melara, C. Barahona, Wilfredo Sifuentes","doi":"10.1109/TDC-LA.2018.8511731","DOIUrl":null,"url":null,"abstract":"During the solar eclipse of August 21, 2017, the Honduras's electric power grid operation experienced changes. In this work, evidence of impact on power generation was found. Although the eclipse in the country was partial, with only 28.9% of photosphere's darkening, operation of the electrical power system was affected, mainly because of 409 MW photovoltaic power are installed in the country's power system. It is equivalent to approximately 17% of installed generation capacity. Hence, an over cost due to re dispatch of power generation during the solar eclipse was found. Due to the results, it is noted that the coming eclipses will have a greater impact on the operation of the power system of Honduras and Central America, due to the increase of non-conventional, solar and wind, renewable energy in Honduras and the rest of the region.","PeriodicalId":267301,"journal":{"name":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","volume":"52 5","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2018.8511731","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

During the solar eclipse of August 21, 2017, the Honduras's electric power grid operation experienced changes. In this work, evidence of impact on power generation was found. Although the eclipse in the country was partial, with only 28.9% of photosphere's darkening, operation of the electrical power system was affected, mainly because of 409 MW photovoltaic power are installed in the country's power system. It is equivalent to approximately 17% of installed generation capacity. Hence, an over cost due to re dispatch of power generation during the solar eclipse was found. Due to the results, it is noted that the coming eclipses will have a greater impact on the operation of the power system of Honduras and Central America, due to the increase of non-conventional, solar and wind, renewable energy in Honduras and the rest of the region.
2017年8月21日洪都拉斯的日食:对电力系统运行影响的证据
在2017年8月21日的日食期间,洪都拉斯的电网运行发生了变化。在这项工作中,发现了对发电影响的证据。虽然该国的日食是局部的,只有28.9%的光球变暗,但电力系统的运行受到影响,主要是因为该国电力系统安装了409兆瓦的光伏发电。这大约相当于发电装机容量的17%。因此,发现了在日食期间由于重新调度发电而造成的超额成本。由于这一结果,值得注意的是,由于洪都拉斯和其他地区的非常规能源、太阳能和风能、可再生能源的增加,即将到来的日食将对洪都拉斯和中美洲电力系统的运行产生更大的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信