VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge

Alejandro Palpan, Sandra Vega, F. Quiroz, Mark Vicuña, Rodrigo Tuesta, A. A. Del Savio
{"title":"VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge","authors":"Alejandro Palpan, Sandra Vega, F. Quiroz, Mark Vicuña, Rodrigo Tuesta, A. A. Del Savio","doi":"10.29173/mocs285","DOIUrl":null,"url":null,"abstract":"Reworks and delays in production processes are commonly found in construction projects associated with a low level of industrialization and a lack of design constructability. To promote industrialization, improve project constructability, and reduce the execution time, we implemented the Virtual Design and Construction (VDC) methodology. An industrialization strategy was established using a prefabricated reinforcement cages system (PRC) elements in an 870-meters bridge construction project in Lima, Peru. The objective was to improve the project buildability with high industrialization of the steel rebar works. We replaced the traditional on-site cutting and bending steel reinforcement processes with an industrial process that integrates construction management with the supply chain through Building Information Model (BIM). As a result, the level of industrialization of the PRC elements of the bridge substructure and superstructure reached 85% and 40%, respectively, aligned with a 16% execution time reduction of the project.","PeriodicalId":422911,"journal":{"name":"Modular and Offsite Construction (MOC) Summit Proceedings","volume":"17 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modular and Offsite Construction (MOC) Summit Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29173/mocs285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Reworks and delays in production processes are commonly found in construction projects associated with a low level of industrialization and a lack of design constructability. To promote industrialization, improve project constructability, and reduce the execution time, we implemented the Virtual Design and Construction (VDC) methodology. An industrialization strategy was established using a prefabricated reinforcement cages system (PRC) elements in an 870-meters bridge construction project in Lima, Peru. The objective was to improve the project buildability with high industrialization of the steel rebar works. We replaced the traditional on-site cutting and bending steel reinforcement processes with an industrial process that integrates construction management with the supply chain through Building Information Model (BIM). As a result, the level of industrialization of the PRC elements of the bridge substructure and superstructure reached 85% and 40%, respectively, aligned with a 16% execution time reduction of the project.
VDC管理在工业化过程中采用预制钢筋网箱。案例研究:Ovalo Monitor Bridge
在与低工业化水平和缺乏设计可施工性相关的建筑项目中,生产过程中的返工和延迟通常会被发现。为了促进产业化,提高项目可施工性,缩短执行时间,我们实施了虚拟设计和施工(VDC)方法。在秘鲁利马的一座870米的桥梁建设项目中,采用预制钢筋笼系统(PRC)元件建立了工业化战略。目的是提高项目的可建造性,使钢筋工程高度工业化。我们用工业流程取代了传统的现场切割和弯曲钢筋流程,通过建筑信息模型(BIM)将施工管理与供应链集成在一起。因此,桥梁下部结构和上部结构的中国构件的工业化水平分别达到85%和40%,与项目执行时间减少16%一致。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信