Electricity Demand Pattern and Supply Availability On Nigeria Grid System

T. Ale, A. Adeyemi
{"title":"Electricity Demand Pattern and Supply Availability On Nigeria Grid System","authors":"T. Ale, A. Adeyemi","doi":"10.33736/jaspe.4264.2022","DOIUrl":null,"url":null,"abstract":"This paper presents the analysis of electricity transmitted and demand on Nigeria's electricity grid system from the year 2018 to 2020 to give the present progress of the electricity system in Nigeria. The daily electricity generated and transmitted data, daily distribution companies (DISCOs) electricity demand and consumption data, and data of transmission lines connected to other neighbouring countries (international lines) within the year 2018 and 2020 were used for the analysis. Also, the extrapolation of the monthly energy of each of the data obtained was computed. The analysis was done and graphs and results obtained showed that daily average electricity day-ahead demand by DISCOs varied majorly between 3.5GW to 4GW with a corresponding increase above 4GW and the total daily day-ahead electricity demand by DISCOs varied majorly between 80GW and 90GW from 2018 to 2020. But despite this demand, the study showed that distribution companies did not at any time pick up to their declared load demand despite being the major electricity stakeholder in electricity delivery to consumers. Also, some generating station units were not generating to their capacity due to fault and gas constraints and some generating stations were connected to the grid without using free governor mode (control required for the generating units to respond to the state of electricity demand on the grid in real-time). The study recommends that the government should ensure proper monitoring and impose necessary sanctions if needs be on any electricity stakeholders and participants who violate the Nigeria Electricity Supply Market Rules for effective and the Nigeria grid code created for efficient power delivery. The government should, as a matter of urgency, start the expansion of her generating stations as well as developing new ones considering other sources for power generation such as wind and solar which are predominately abundant in the northern part of the country.","PeriodicalId":159511,"journal":{"name":"Journal of Applied Science & Process Engineering","volume":"487 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Science & Process Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33736/jaspe.4264.2022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper presents the analysis of electricity transmitted and demand on Nigeria's electricity grid system from the year 2018 to 2020 to give the present progress of the electricity system in Nigeria. The daily electricity generated and transmitted data, daily distribution companies (DISCOs) electricity demand and consumption data, and data of transmission lines connected to other neighbouring countries (international lines) within the year 2018 and 2020 were used for the analysis. Also, the extrapolation of the monthly energy of each of the data obtained was computed. The analysis was done and graphs and results obtained showed that daily average electricity day-ahead demand by DISCOs varied majorly between 3.5GW to 4GW with a corresponding increase above 4GW and the total daily day-ahead electricity demand by DISCOs varied majorly between 80GW and 90GW from 2018 to 2020. But despite this demand, the study showed that distribution companies did not at any time pick up to their declared load demand despite being the major electricity stakeholder in electricity delivery to consumers. Also, some generating station units were not generating to their capacity due to fault and gas constraints and some generating stations were connected to the grid without using free governor mode (control required for the generating units to respond to the state of electricity demand on the grid in real-time). The study recommends that the government should ensure proper monitoring and impose necessary sanctions if needs be on any electricity stakeholders and participants who violate the Nigeria Electricity Supply Market Rules for effective and the Nigeria grid code created for efficient power delivery. The government should, as a matter of urgency, start the expansion of her generating stations as well as developing new ones considering other sources for power generation such as wind and solar which are predominately abundant in the northern part of the country.
尼日利亚电网系统的电力需求模式和供应可用性
本文通过对2018年至2020年尼日利亚电网系统的电力传输和需求进行分析,给出了尼日利亚电力系统的现状。分析使用了2018年和2020年的日发电量和输电数据、日配电公司(DISCOs)电力需求和消费数据以及与其他邻国连接的输电线路(国际线路)数据。此外,还计算了所获得的每个数据的月能量的外推。通过分析得到的图表和结果显示,2018 - 2020年,DISCOs的日平均超前电力需求主要在3.5GW - 4GW之间变化,相应增加4GW以上,而DISCOs的日总超前电力需求主要在80GW - 90GW之间变化。但是,尽管有这样的需求,研究表明,尽管配电公司是向消费者输送电力的主要利益相关者,但它们并没有在任何时候增加其宣布的负荷需求。此外,由于故障和燃气的限制,一些电站机组没有达到其发电能力,一些电站没有使用自由调速器模式(发电机组实时响应电网电力需求状态所需的控制)连接到电网。该研究建议,政府应确保适当的监督,并在必要时对任何违反尼日利亚电力供应市场规则和尼日利亚电网代码的电力利益相关者和参与者实施必要的制裁。政府应该,作为一件紧急的事情,开始扩大她的发电站,并考虑到其他的发电来源,如风能和太阳能,在该国的北部地区主要是丰富的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信