Investissement pour la réalisation d'ouvrages de transport électrique. Planification par la méthode Electre III

O. Belmokhtar, Nacéra Aboun
{"title":"Investissement pour la réalisation d'ouvrages de transport électrique. Planification par la méthode Electre III","authors":"O. Belmokhtar, Nacéra Aboun","doi":"10.3166/JDS.15.361-388","DOIUrl":null,"url":null,"abstract":"This study concerns the development strategy of an enterprise that wants to satisfy an economic demand, by minimization costs of investments and exploitation, and to assure a certain level of reliability, according to social and financial constraints and environmental policies. However, all planed investments (electrical transportation networks) cannot be realized in their totality due to not sufficient financial resources. Therefore, it is necessary to establish a priority order classification based on economic and technical criteria.","PeriodicalId":288103,"journal":{"name":"J. Decis. Syst.","volume":"265 8","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"J. Decis. Syst.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3166/JDS.15.361-388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This study concerns the development strategy of an enterprise that wants to satisfy an economic demand, by minimization costs of investments and exploitation, and to assure a certain level of reliability, according to social and financial constraints and environmental policies. However, all planed investments (electrical transportation networks) cannot be realized in their totality due to not sufficient financial resources. Therefore, it is necessary to establish a priority order classification based on economic and technical criteria.
投资建设电力运输工程。使用Electre III方法进行规划
本研究关注的是一个企业的发展战略,该企业希望通过最小化投资和开发成本来满足经济需求,并根据社会和财务约束以及环境政策确保一定程度的可靠性。然而,由于没有足够的财政资源,所有计划的投资(电力运输网络)都无法全部实现。因此,有必要建立一个基于经济和技术标准的优先顺序分类。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信