{"title":"APPROACH SELECTION METHOD FOR PROJECT PORTFOLIO MANAGEMENT AND ITS APPLICATION","authors":"Igor Kononenko, Maximilien Kpodjedo","doi":"10.20998/2413-3000.2022.5.3","DOIUrl":null,"url":null,"abstract":"Project portfolio management has evolved in recent decades from an empirical field to a field with advanced management technologies, including the active use of information technology. A number of standards and guidelines for project portfolio management have been created. Many dozens of specialized software tools have been developed. The effectiveness of an organization's project portfolio management significantly depends on the chosen management approach, as well as the level of use of project portfolio management capabilities. The level of utilization of project portfolio management capabilities is the level of maturity of an organization in this area. The aim of the article is to apply the method of project portfolio management approach selection. The article proposes to carry out the selection of a project portfolio management approach by solving a two-criteria problem. The first criterion is the risks inherent in this approach in the management of the organization's project portfolio under specific conditions. The less these risks, the more qualitative approach is applied. The second criterion - the costs of applying the evaluated approach. The application of the proposed method to improve project portfolio management in one of the technical universities in Ukraine was considered. Risks from non-performance or imperfect performance of portfolio management processes at the university were assessed. We also assessed the existing costs of managing the portfolio of projects.  To improve the quality of management at the university, it is advisable to improve the execution of portfolio management processes and implement those processes that are not yet performed. This can be done by implementing a computerized portfolio and project management system for the university. Jira Portfolio Commercial can be used as such a system. With the use of computerization, new processes for project portfolio management will appear. For a number of existing processes in the organization, employee payroll costs will be reduced. For many processes, risks from non-performance or imperfect execution will be reduced. Computerization of project portfolio management will enable to reduce management costs by 1.8% and risks by 49.4%, i.e. almost by half.","PeriodicalId":185781,"journal":{"name":"Bulletin of NTU \"KhPI\". Series: Strategic management, portfolio, program and project management","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of NTU \"KhPI\". Series: Strategic management, portfolio, program and project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20998/2413-3000.2022.5.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Project portfolio management has evolved in recent decades from an empirical field to a field with advanced management technologies, including the active use of information technology. A number of standards and guidelines for project portfolio management have been created. Many dozens of specialized software tools have been developed. The effectiveness of an organization's project portfolio management significantly depends on the chosen management approach, as well as the level of use of project portfolio management capabilities. The level of utilization of project portfolio management capabilities is the level of maturity of an organization in this area. The aim of the article is to apply the method of project portfolio management approach selection. The article proposes to carry out the selection of a project portfolio management approach by solving a two-criteria problem. The first criterion is the risks inherent in this approach in the management of the organization's project portfolio under specific conditions. The less these risks, the more qualitative approach is applied. The second criterion - the costs of applying the evaluated approach. The application of the proposed method to improve project portfolio management in one of the technical universities in Ukraine was considered. Risks from non-performance or imperfect performance of portfolio management processes at the university were assessed. We also assessed the existing costs of managing the portfolio of projects.  To improve the quality of management at the university, it is advisable to improve the execution of portfolio management processes and implement those processes that are not yet performed. This can be done by implementing a computerized portfolio and project management system for the university. Jira Portfolio Commercial can be used as such a system. With the use of computerization, new processes for project portfolio management will appear. For a number of existing processes in the organization, employee payroll costs will be reduced. For many processes, risks from non-performance or imperfect execution will be reduced. Computerization of project portfolio management will enable to reduce management costs by 1.8% and risks by 49.4%, i.e. almost by half.
项目组合管理的方法选择方法及其应用
近几十年来,项目组合管理已经从一个经验领域发展成为一个具有先进管理技术的领域,包括积极使用信息技术。已经创建了许多项目组合管理的标准和指导方针。许多专门的软件工具已经被开发出来。组织的项目组合管理的有效性很大程度上取决于所选择的管理方法,以及项目组合管理能力的使用水平。项目组合管理能力的利用水平是组织在该领域的成熟度水平。本文的目的是应用项目组合管理方法选择的方法。本文提出通过解决一个双标准问题来进行项目组合管理方法的选择。第一个标准是在特定条件下组织项目组合管理中这种方法所固有的风险。这些风险越小,应用的定性方法就越多。第二个标准-应用评估方法的成本。讨论了在乌克兰的一所技术大学中应用所提出的方法来改进项目组合管理。评估了大学投资组合管理过程的不绩效或不完善绩效所带来的风险。我们还评估了管理项目组合的现有成本。为了提高大学的管理质量,建议改进项目组合管理过程的执行,并实施那些尚未执行的过程。这可以通过为大学实施计算机化的投资组合和项目管理系统来完成。Jira Portfolio Commercial可以作为这样一个系统使用。随着计算机化的使用,项目组合管理的新过程将会出现。对于组织中的许多现有流程,将减少员工工资成本。对于许多流程,不履行或执行不完善的风险将会降低。项目组合管理的计算机化将使管理成本降低1.8%,风险降低49.4%,即几乎降低一半。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信