Problem analysis and probable solution of existing interconnected grid system of Chittagong region

Md. Khurshedul Islam, Md. Mizanur Rahman, Md. Fazle Rabbi
{"title":"Problem analysis and probable solution of existing interconnected grid system of Chittagong region","authors":"Md. Khurshedul Islam, Md. Mizanur Rahman, Md. Fazle Rabbi","doi":"10.1109/ICAEE.2015.7506860","DOIUrl":null,"url":null,"abstract":"Power crisis is one of the foremost concerning problem in Bangladesh. The gap between demand and production is increasing day by day. System loss, transmission loss and established connection to grid without upcoming load plan are main issues regarding this crisis. It is possible to control this crisis by taking some necessary steps such as system loss reduction, establishing efficient interconnection, assembling necessary substation etc. Priority should be given to transmission and distribution of electrical energy through the proper way. This paper represents a case study and analysis to find out the key problems of existing power system including generating station, interconnected grid system and substations of Chittagong. Existing generating station with their generating capacity, transmission lines with their length as well as conductor grade and substation with its load are studied to figure out the major problems and finally it offers smoe probable solutions of these problems.","PeriodicalId":123939,"journal":{"name":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","volume":"20 12","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE.2015.7506860","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Power crisis is one of the foremost concerning problem in Bangladesh. The gap between demand and production is increasing day by day. System loss, transmission loss and established connection to grid without upcoming load plan are main issues regarding this crisis. It is possible to control this crisis by taking some necessary steps such as system loss reduction, establishing efficient interconnection, assembling necessary substation etc. Priority should be given to transmission and distribution of electrical energy through the proper way. This paper represents a case study and analysis to find out the key problems of existing power system including generating station, interconnected grid system and substations of Chittagong. Existing generating station with their generating capacity, transmission lines with their length as well as conductor grade and substation with its load are studied to figure out the major problems and finally it offers smoe probable solutions of these problems.
吉大港地区现有互联电网系统问题分析及可能解决方案
电力危机是孟加拉国最受关注的问题之一。需求和生产之间的差距日益扩大。系统损耗、传输损耗和无负荷计划的并网是这一危机的主要问题。通过采取一些必要的措施,如减少系统损耗,建立有效的互连,组建必要的变电站等,可以控制这一危机。优先考虑以合理的方式传输和分配电能。本文通过对吉大港现有电站、并网系统、变电站等电力系统的实例分析,找出存在的关键问题。对现有电站的发电能力、输电线路的长度和导线等级以及变电站的负荷进行了研究,找出了存在的主要问题,并提出了解决这些问题的一些可能的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信