{"title":"Research on new thermal treatment processes for domestic refuse in the Netherlands","authors":"W.J. Ludikhuize","doi":"10.1016/0304-3967(80)90006-2","DOIUrl":null,"url":null,"abstract":"<div><p>Decisions must be made soon in the Netherlands in regard to the new Waste Disposal Act with respect to future waste treatment methods. For this reason, there is a need for data related to the specific waste composition in the Netherlands. Three research projects in the field of thermal treatment have been started recently: fluid-bed combustion, cocurrent gasification, and spouted-fluid-bed pyrolysis. A brief description of the basic research program and the processes involved is presented. The final evaluation of the three processes is expected to be completed in about two years.</p></div>","PeriodicalId":101078,"journal":{"name":"Resource Recovery and Conservation","volume":"5 3","pages":"Pages 267-274"},"PeriodicalIF":0.0000,"publicationDate":"1980-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0304-3967(80)90006-2","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Resource Recovery and Conservation","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0304396780900062","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Decisions must be made soon in the Netherlands in regard to the new Waste Disposal Act with respect to future waste treatment methods. For this reason, there is a need for data related to the specific waste composition in the Netherlands. Three research projects in the field of thermal treatment have been started recently: fluid-bed combustion, cocurrent gasification, and spouted-fluid-bed pyrolysis. A brief description of the basic research program and the processes involved is presented. The final evaluation of the three processes is expected to be completed in about two years.