{"title":"数据中心灾难恢复响应中的故障安全点。","authors":"Russell Neal","doi":"","DOIUrl":null,"url":null,"abstract":"<p><p>Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.</p>","PeriodicalId":39080,"journal":{"name":"Journal of business continuity & emergency planning","volume":"16 3","pages":"229-247"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Failsafe points in data centre disaster recovery response.\",\"authors\":\"Russell Neal\",\"doi\":\"\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p><p>Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.</p>\",\"PeriodicalId\":39080,\"journal\":{\"name\":\"Journal of business continuity & emergency planning\",\"volume\":\"16 3\",\"pages\":\"229-247\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of business continuity & emergency planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Medicine\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of business continuity & emergency planning","FirstCategoryId":"1085","ListUrlMain":"","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Medicine","Score":null,"Total":0}
Failsafe points in data centre disaster recovery response.
Certain social psychological variables can result in delays to essential steps in IT data centre disaster recovery response, including the formal declaration of disaster. These delays can result in failure to meet recovery time objectives, additional financial losses, regulatory issues and a significant loss of customer goodwill, all beyond what would have been incurred in the absence of delays. This paper describes a failsafe model to counter these variables. The model will help ensure that any disaster recovery response step earmarked as a failsafe point is completed in a timely manner, from the moment of disaster to the resumption of business.
期刊介绍:
Journal of Business Continuity & Emergency Planning is the leading professional journal publishing peer-reviewed articles and case studies written by and for business continuity and emergency managers.