N. Marinković, M. Jovanovski, Elefterija Zlatanović, Lazar Zivkovic
{"title":"隧道施工中岩体初始参数的外推技术","authors":"N. Marinković, M. Jovanovski, Elefterija Zlatanović, Lazar Zivkovic","doi":"10.37023/ee.9.1-2.3","DOIUrl":null,"url":null,"abstract":"It is important to perform research to the degree that it is adequate to identify the features of the terrain composition, before, during, and after the building of facilities since predicting the behaviour of rock mass during tunnel construction is a complicated engineering challenge. Engineering research works in laboratories and in the field are of different scope and methodology during testing. In this paper, the established interdependencies of some of the basic parameters obtained during the testing of rock mass are presented: Edyn = f(Vp), Edyn = f(RMR) i Edyn = f(Q). Also, the relations between the engineering systems of rock mass classification and seismic primary waves are derived. RMR = f(Vp), Q = f(Vp). The relations were based on the examination of the rock mass for the construction needs of the tunnel on the Nis-Merdare highway. The results obtained in this study can be applied in environments that have similar lithological and structural characteristics.","PeriodicalId":50518,"journal":{"name":"Environmental & Engineering Geoscience","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2022-12-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The technique for\\nextrapolation of rock mass initial parameters during the construction of the\\ntunnel\",\"authors\":\"N. Marinković, M. Jovanovski, Elefterija Zlatanović, Lazar Zivkovic\",\"doi\":\"10.37023/ee.9.1-2.3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is important to perform research to the degree that it is adequate to identify the features of the terrain composition, before, during, and after the building of facilities since predicting the behaviour of rock mass during tunnel construction is a complicated engineering challenge. Engineering research works in laboratories and in the field are of different scope and methodology during testing. In this paper, the established interdependencies of some of the basic parameters obtained during the testing of rock mass are presented: Edyn = f(Vp), Edyn = f(RMR) i Edyn = f(Q). Also, the relations between the engineering systems of rock mass classification and seismic primary waves are derived. RMR = f(Vp), Q = f(Vp). The relations were based on the examination of the rock mass for the construction needs of the tunnel on the Nis-Merdare highway. The results obtained in this study can be applied in environments that have similar lithological and structural characteristics.\",\"PeriodicalId\":50518,\"journal\":{\"name\":\"Environmental & Engineering Geoscience\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.0000,\"publicationDate\":\"2022-12-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Environmental & Engineering Geoscience\",\"FirstCategoryId\":\"89\",\"ListUrlMain\":\"https://doi.org/10.37023/ee.9.1-2.3\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, ENVIRONMENTAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental & Engineering Geoscience","FirstCategoryId":"89","ListUrlMain":"https://doi.org/10.37023/ee.9.1-2.3","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, ENVIRONMENTAL","Score":null,"Total":0}
The technique for
extrapolation of rock mass initial parameters during the construction of the
tunnel
It is important to perform research to the degree that it is adequate to identify the features of the terrain composition, before, during, and after the building of facilities since predicting the behaviour of rock mass during tunnel construction is a complicated engineering challenge. Engineering research works in laboratories and in the field are of different scope and methodology during testing. In this paper, the established interdependencies of some of the basic parameters obtained during the testing of rock mass are presented: Edyn = f(Vp), Edyn = f(RMR) i Edyn = f(Q). Also, the relations between the engineering systems of rock mass classification and seismic primary waves are derived. RMR = f(Vp), Q = f(Vp). The relations were based on the examination of the rock mass for the construction needs of the tunnel on the Nis-Merdare highway. The results obtained in this study can be applied in environments that have similar lithological and structural characteristics.
期刊介绍:
The Environmental & Engineering Geoscience Journal publishes peer-reviewed manuscripts that address issues relating to the interaction of people with hydrologic and geologic systems. Theoretical and applied contributions are appropriate, and the primary criteria for acceptance are scientific and technical merit.