{"title":"PERANCANGAN DAN PEMBANGUNAN ATAP HALAMAN MASJID AL ASEL, PERUMAHAN KANOMAN, BANYURADEN, GAMPING, SLEMAN, DIY","authors":"Anita Widianti, Mandiyo Priyo, E. Prasetio, Mulya Alpriandi","doi":"10.12928/JP.V4I2.1946","DOIUrl":null,"url":null,"abstract":"Al Asel Mosque is one of the mosques in Banyumeneng Hamlet, Banyuraden, Gamping, Sleman, DIY, which was established in 1985. Over time the number of worshipers has increased. The current size of the mosque is no longer sufficient to accommodate people who want to worship, especially Friday prayers and Tarawih prayers in the month of Ramadhan, so that they often spill out to the courtyard of the mosque. Problems arise when it starts to enter the rainy season. The mosque yard covering an area of 12x12 m2 which has been covered by concrete block and marked for prayer can not be used anymore. As a result, prayers had to crowd within the mosque and on the porch, even forced to pray on the terrace of the kindergarten room. This of course reduces the solemnity during worship. The committee of Al Asel Mosque planned to build a roof of the mosque courtyard so that the prayers can pray on the courtyard during rain. The purpose of this activity is to help the committee of Al Asel Mosque realize the roof structure of the mosque's yard covering an area of 12x12m2. The method of activities carried out include designing the roof structure and supervision during the construction process in a few weeks. The design process produced documents consisting of design drawings and budget plans. After the completion of the mosque roof construction, the capacity of pilgrims increased and it is expected that prayers would be more solemn during worship.","PeriodicalId":17710,"journal":{"name":"Jurnal Pemberdayaan: Publikasi Hasil Pengabdian Kepada Masyarakat","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Pemberdayaan: Publikasi Hasil Pengabdian Kepada Masyarakat","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12928/JP.V4I2.1946","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Al Asel清真寺是Banyumeneng哈姆雷特,Banyuraden, Gamping, Sleman, DIY的清真寺之一,成立于1985年。随着时间的推移,做礼拜的人越来越多。清真寺目前的规模已不足以容纳想要做礼拜的人,特别是在斋月的星期五祈祷和塔拉威祈祷,因此他们经常涌向清真寺的院子。当雨季开始时,问题就出现了。清真寺院子占地12 × 12平方米,已被混凝土块覆盖,并标记为祈祷,不能再使用。结果,祈祷者不得不聚集在清真寺内和门廊上,甚至被迫在幼儿园房间的露台上祈祷。这当然降低了礼拜的严肃性。Al Asel清真寺委员会计划在清真寺庭院上建造屋顶,以便祈祷者在下雨时可以在庭院上祈祷。本次活动的目的是帮助Al Asel清真寺委员会实现清真寺庭院的屋顶结构,面积为12x12m2。进行的活动方法包括在几周内进行屋顶结构设计和施工过程中的监督。设计过程产生的文件包括设计图纸和预算计划。清真寺屋顶建设完成后,朝圣者的能力增加,预计礼拜期间的祈祷将更加庄严。
PERANCANGAN DAN PEMBANGUNAN ATAP HALAMAN MASJID AL ASEL, PERUMAHAN KANOMAN, BANYURADEN, GAMPING, SLEMAN, DIY
Al Asel Mosque is one of the mosques in Banyumeneng Hamlet, Banyuraden, Gamping, Sleman, DIY, which was established in 1985. Over time the number of worshipers has increased. The current size of the mosque is no longer sufficient to accommodate people who want to worship, especially Friday prayers and Tarawih prayers in the month of Ramadhan, so that they often spill out to the courtyard of the mosque. Problems arise when it starts to enter the rainy season. The mosque yard covering an area of 12x12 m2 which has been covered by concrete block and marked for prayer can not be used anymore. As a result, prayers had to crowd within the mosque and on the porch, even forced to pray on the terrace of the kindergarten room. This of course reduces the solemnity during worship. The committee of Al Asel Mosque planned to build a roof of the mosque courtyard so that the prayers can pray on the courtyard during rain. The purpose of this activity is to help the committee of Al Asel Mosque realize the roof structure of the mosque's yard covering an area of 12x12m2. The method of activities carried out include designing the roof structure and supervision during the construction process in a few weeks. The design process produced documents consisting of design drawings and budget plans. After the completion of the mosque roof construction, the capacity of pilgrims increased and it is expected that prayers would be more solemn during worship.