M. Nukhaev, K. Rymarenko, V. Baranov, S. Grishenko, A. Zaycev, Galymzan Aitkaliev, V. Kabanov, Tatyana Gusachenko, A. Golubtsov
{"title":"Vostochno-Makarovskoe油田实施凝析气井运行监测技术优化液态烃产量的效果","authors":"M. Nukhaev, K. Rymarenko, V. Baranov, S. Grishenko, A. Zaycev, Galymzan Aitkaliev, V. Kabanov, Tatyana Gusachenko, A. Golubtsov","doi":"10.2118/206579-ms","DOIUrl":null,"url":null,"abstract":"\n Liquid hydrocarbon production optimization is among key tasks in the gas condensate fields development. It depends on changes in gas supply quotas and on seasonal fluctuations in demand. The key point for such an optimization is the need to understand the current condensate-gas factor (CGF) for each well of the field to select the operating modes. Often, there is no sufficient well surveying data as these surveys are conducted not frequently enough. The paper presents an approach that allows monitoring the CGF for each well in real time and control the operating modes of the wells.","PeriodicalId":11177,"journal":{"name":"Day 4 Fri, October 15, 2021","volume":"20 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Results of the Implementation of the Technology for Monitoring the Operation of Gas and Gas Condensate Wells According to Condensate to Gas Ratio to Optimize the Production of Liquid Hydrocarbons on the Vostochno-Makarovskoe Field\",\"authors\":\"M. Nukhaev, K. Rymarenko, V. Baranov, S. Grishenko, A. Zaycev, Galymzan Aitkaliev, V. Kabanov, Tatyana Gusachenko, A. Golubtsov\",\"doi\":\"10.2118/206579-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Liquid hydrocarbon production optimization is among key tasks in the gas condensate fields development. It depends on changes in gas supply quotas and on seasonal fluctuations in demand. The key point for such an optimization is the need to understand the current condensate-gas factor (CGF) for each well of the field to select the operating modes. Often, there is no sufficient well surveying data as these surveys are conducted not frequently enough. The paper presents an approach that allows monitoring the CGF for each well in real time and control the operating modes of the wells.\",\"PeriodicalId\":11177,\"journal\":{\"name\":\"Day 4 Fri, October 15, 2021\",\"volume\":\"20 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Fri, October 15, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/206579-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, October 15, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206579-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Results of the Implementation of the Technology for Monitoring the Operation of Gas and Gas Condensate Wells According to Condensate to Gas Ratio to Optimize the Production of Liquid Hydrocarbons on the Vostochno-Makarovskoe Field
Liquid hydrocarbon production optimization is among key tasks in the gas condensate fields development. It depends on changes in gas supply quotas and on seasonal fluctuations in demand. The key point for such an optimization is the need to understand the current condensate-gas factor (CGF) for each well of the field to select the operating modes. Often, there is no sufficient well surveying data as these surveys are conducted not frequently enough. The paper presents an approach that allows monitoring the CGF for each well in real time and control the operating modes of the wells.