{"title":"一种具有接收订单和安装时间的不相关并行机调度的精确分解方法","authors":"Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu","doi":"10.2139/ssrn.4076656","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":10663,"journal":{"name":"Comput. Ind. Eng.","volume":"32 1","pages":"108899"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An exact decomposition method for unrelated parallel machine scheduling with order acceptance and setup times\",\"authors\":\"Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu\",\"doi\":\"10.2139/ssrn.4076656\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":10663,\"journal\":{\"name\":\"Comput. Ind. Eng.\",\"volume\":\"32 1\",\"pages\":\"108899\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Comput. Ind. Eng.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.4076656\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Comput. Ind. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.4076656","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2