错开上课时间以分散公共交通的高峰需求。收益与成本

IF 0.3 4区 工程技术 Q4 ECONOMICS
Anders Ljungberg
{"title":"错开上课时间以分散公共交通的高峰需求。收益与成本","authors":"Anders Ljungberg","doi":"10.1400/109331","DOIUrl":null,"url":null,"abstract":"The author uses a case study of student transportation by public bus in Linkoping, Sweden, to discuss the possibility of public transportation peak demand spread through staggered school hours. The study found that introducing a staggered morning start for Linkoping's high schools can substantially reduce extreme morning peak at only one departure point on Linkoping's many lines. It demonstrated that bus service cost savings from the leveling out of the extreme morning peak could be of the same magnitude as costs for students resulting from a change in school hours. Staggered school hours could introduce other changes that could benefit the bus transportation system while reducing student costs. Cooperation between the public transportation authority and the high school headmasters is the biggest challenge.","PeriodicalId":44910,"journal":{"name":"International Journal of Transport Economics","volume":"44 1","pages":"1000-1020"},"PeriodicalIF":0.3000,"publicationDate":"2009-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Staggered School Hours to Spread Peak Demand for Public Transport. Benefits and Costs\",\"authors\":\"Anders Ljungberg\",\"doi\":\"10.1400/109331\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The author uses a case study of student transportation by public bus in Linkoping, Sweden, to discuss the possibility of public transportation peak demand spread through staggered school hours. The study found that introducing a staggered morning start for Linkoping's high schools can substantially reduce extreme morning peak at only one departure point on Linkoping's many lines. It demonstrated that bus service cost savings from the leveling out of the extreme morning peak could be of the same magnitude as costs for students resulting from a change in school hours. Staggered school hours could introduce other changes that could benefit the bus transportation system while reducing student costs. Cooperation between the public transportation authority and the high school headmasters is the biggest challenge.\",\"PeriodicalId\":44910,\"journal\":{\"name\":\"International Journal of Transport Economics\",\"volume\":\"44 1\",\"pages\":\"1000-1020\"},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2009-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Transport Economics\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1400/109331\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ECONOMICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Transport Economics","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1400/109331","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ECONOMICS","Score":null,"Total":0}
引用次数: 3

摘要

作者以瑞典林雪平市的学生公交为例,探讨了公共交通高峰需求通过错开上课时间传播的可能性。研究发现,在林雪平的高中引入错开的早上出发时间,可以大大减少林雪平多条线路上只有一个出发点的极端早晨高峰。研究表明,消除极端早高峰所节省的公交服务成本,可能与改变上课时间给学生带来的成本相当。错开上课时间可能会带来其他变化,这可能有利于公交运输系统,同时降低学生成本。公共交通当局和高中校长之间的合作是最大的挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Staggered School Hours to Spread Peak Demand for Public Transport. Benefits and Costs
The author uses a case study of student transportation by public bus in Linkoping, Sweden, to discuss the possibility of public transportation peak demand spread through staggered school hours. The study found that introducing a staggered morning start for Linkoping's high schools can substantially reduce extreme morning peak at only one departure point on Linkoping's many lines. It demonstrated that bus service cost savings from the leveling out of the extreme morning peak could be of the same magnitude as costs for students resulting from a change in school hours. Staggered school hours could introduce other changes that could benefit the bus transportation system while reducing student costs. Cooperation between the public transportation authority and the high school headmasters is the biggest challenge.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.90
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信