某RMG厂缝纫线及生产线平衡提高生产率的研究

M. A. Samad, P. P. Chowdhury, G. Rabbani, Md Nure Alam Siddiqe Uzzal
{"title":"某RMG厂缝纫线及生产线平衡提高生产率的研究","authors":"M. A. Samad, P. P. Chowdhury, G. Rabbani, Md Nure Alam Siddiqe Uzzal","doi":"10.51983/ajeat-2023.12.1.3501","DOIUrl":null,"url":null,"abstract":"The RMG industries play a major role in the economic development of Bangladesh. However, in the current business environment, like every other country all over the world, this sector also faces some troubles related to resource constraints like time, cost, materials, etc. So, to ensure the sustainability and competitiveness of the RMG industries of Bangladesh, productivity improvement becomes the key factor. For this reason, this research aims to measure and improve the productivity of other performances of a sewing line of a selected RMG industry. This study uses time study, expert opinions, and the line-balancing method. This research finds that before improvement in the line efficiency, total idle time, and the number of workstations is 43.04%, 9.401 minutes per cycle, and 19 respectively. But after improvement in the line efficiency, total idle time and number of workstations become 81.78%, 1.6087 minutes per cycle, and 10 respectively. Thus, the findings of this research prove that implementing a line-balancing strategy in the sewing section of RMG industries can boost productivity. So, this research can be useful for other RMG industries for future implementation.","PeriodicalId":8524,"journal":{"name":"Asian Journal of Engineering and Applied Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study of a Sewing Line of an RMG Factory and Productivity Improvement through Line Balancing\",\"authors\":\"M. A. Samad, P. P. Chowdhury, G. Rabbani, Md Nure Alam Siddiqe Uzzal\",\"doi\":\"10.51983/ajeat-2023.12.1.3501\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The RMG industries play a major role in the economic development of Bangladesh. However, in the current business environment, like every other country all over the world, this sector also faces some troubles related to resource constraints like time, cost, materials, etc. So, to ensure the sustainability and competitiveness of the RMG industries of Bangladesh, productivity improvement becomes the key factor. For this reason, this research aims to measure and improve the productivity of other performances of a sewing line of a selected RMG industry. This study uses time study, expert opinions, and the line-balancing method. This research finds that before improvement in the line efficiency, total idle time, and the number of workstations is 43.04%, 9.401 minutes per cycle, and 19 respectively. But after improvement in the line efficiency, total idle time and number of workstations become 81.78%, 1.6087 minutes per cycle, and 10 respectively. Thus, the findings of this research prove that implementing a line-balancing strategy in the sewing section of RMG industries can boost productivity. So, this research can be useful for other RMG industries for future implementation.\",\"PeriodicalId\":8524,\"journal\":{\"name\":\"Asian Journal of Engineering and Applied Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Asian Journal of Engineering and Applied Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51983/ajeat-2023.12.1.3501\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asian Journal of Engineering and Applied Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51983/ajeat-2023.12.1.3501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

RMG工业在孟加拉国的经济发展中发挥着重要作用。然而,在目前的商业环境下,就像世界上任何其他国家一样,这个部门也面临着一些与时间、成本、材料等资源限制有关的麻烦。因此,为了确保孟加拉国RMG产业的可持续性和竞争力,提高生产率成为关键因素。为此,本研究旨在衡量和提高生产率的缝纫线的其他性能的一个选定的RMG行业。本研究采用时间研究法、专家意见法和线平衡法。本研究发现,在提高生产线效率之前,总空闲时间为43.04%,每周期9.401分钟,工作站数为19个。但在提高线路效率后,总空闲时间为81.78%,每周期空闲工作站数为1.6087分钟,每周期空闲工作站数为10个。因此,本研究的结果证明,实施线平衡策略的缝纫部分的RMG行业可以提高生产率。因此,本研究可以为其他RMG行业的未来实施提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study of a Sewing Line of an RMG Factory and Productivity Improvement through Line Balancing
The RMG industries play a major role in the economic development of Bangladesh. However, in the current business environment, like every other country all over the world, this sector also faces some troubles related to resource constraints like time, cost, materials, etc. So, to ensure the sustainability and competitiveness of the RMG industries of Bangladesh, productivity improvement becomes the key factor. For this reason, this research aims to measure and improve the productivity of other performances of a sewing line of a selected RMG industry. This study uses time study, expert opinions, and the line-balancing method. This research finds that before improvement in the line efficiency, total idle time, and the number of workstations is 43.04%, 9.401 minutes per cycle, and 19 respectively. But after improvement in the line efficiency, total idle time and number of workstations become 81.78%, 1.6087 minutes per cycle, and 10 respectively. Thus, the findings of this research prove that implementing a line-balancing strategy in the sewing section of RMG industries can boost productivity. So, this research can be useful for other RMG industries for future implementation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信