{"title":"核电站放射性废物管理研究:鲁普尔核电站的展望","authors":"I. Ahmed, H. Joni, Hridita Nowrin Pranti","doi":"10.34257/gjreavol19is4pg69","DOIUrl":null,"url":null,"abstract":"The nuclear power plant is required to supply a substantial amount of electricity for a densely populated country like Bangladesh. The government of Bangladesh has attached to a commitment to implement the Rooppur Nuclear Power Plant, and so Bangladesh will be the 33 nuclear powerproducing country after the successful construction of this plant. Bangladesh has planned to construct two power units (Rooppur-1 & Rooppur-2) with a capacity of 1200 MW, each of and is expected to go into operation in 2023. Russian Rosatom State Atomic Energy Corporation is constructing this nuclear power plant, which is the generation-3+ VVER-1200 model. But the main concern is how a third world country like Bangladesh can handle the tons of radioactive waste of RNNP. Radioactive waste i.e., a variety of solids, liquids, and gases which are produced during the generation of nuclear energy in a nuclear reactor. Depending on activity content, solid and liquid waste are disposed of in near-surface or deep geological facilities, and gaseous waste is dissolved by following some filtering process. If not properly disposed of or recycled, irradiation from radioactive waste will cause major problems for the environment. Various stages should be required for the removal of a tremendous amount of radioactive waste in a costeffective way. This paper mainly delineates the proximate of radioactive waste management of RNNP and gives an account of (1) Radioactivity and radiation level, (2) Classification, (3) Treatment of solid, liquid and gaseous radioactive waste, (4) Reprocessing and packaging, (5) Storage and (6) Disposal.","PeriodicalId":12520,"journal":{"name":"Global Journal of Research In Engineering","volume":"23 1","pages":"69-79"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study of Radioactive Waste Management of Nuclear Power Plant: Prospect of Rooppur Nuclear Power Plant\",\"authors\":\"I. Ahmed, H. Joni, Hridita Nowrin Pranti\",\"doi\":\"10.34257/gjreavol19is4pg69\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The nuclear power plant is required to supply a substantial amount of electricity for a densely populated country like Bangladesh. The government of Bangladesh has attached to a commitment to implement the Rooppur Nuclear Power Plant, and so Bangladesh will be the 33 nuclear powerproducing country after the successful construction of this plant. Bangladesh has planned to construct two power units (Rooppur-1 & Rooppur-2) with a capacity of 1200 MW, each of and is expected to go into operation in 2023. Russian Rosatom State Atomic Energy Corporation is constructing this nuclear power plant, which is the generation-3+ VVER-1200 model. But the main concern is how a third world country like Bangladesh can handle the tons of radioactive waste of RNNP. Radioactive waste i.e., a variety of solids, liquids, and gases which are produced during the generation of nuclear energy in a nuclear reactor. Depending on activity content, solid and liquid waste are disposed of in near-surface or deep geological facilities, and gaseous waste is dissolved by following some filtering process. If not properly disposed of or recycled, irradiation from radioactive waste will cause major problems for the environment. Various stages should be required for the removal of a tremendous amount of radioactive waste in a costeffective way. This paper mainly delineates the proximate of radioactive waste management of RNNP and gives an account of (1) Radioactivity and radiation level, (2) Classification, (3) Treatment of solid, liquid and gaseous radioactive waste, (4) Reprocessing and packaging, (5) Storage and (6) Disposal.\",\"PeriodicalId\":12520,\"journal\":{\"name\":\"Global Journal of Research In Engineering\",\"volume\":\"23 1\",\"pages\":\"69-79\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Global Journal of Research In Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.34257/gjreavol19is4pg69\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Global Journal of Research In Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34257/gjreavol19is4pg69","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

该核电站需要为像孟加拉国这样人口稠密的国家提供大量电力。孟加拉国政府已承诺实施鲁普尔核电站,因此,在该核电站成功建设后,孟加拉国将成为第33个核电生产国。孟加拉国计划建造两台发电机组(Rooppur-1和Rooppur-2),容量为1200兆瓦,预计将于2023年投入运行。俄罗斯Rosatom国家原子能公司正在建造该核电站,该核电站是第3代+ VVER-1200型。但主要的问题是,像孟加拉国这样的第三世界国家如何处理RNNP产生的大量放射性废物。放射性废物,即在核反应堆中产生核能时产生的各种固体、液体和气体。根据活性含量的不同,固体和液体废物被处理在近地表或深层地质设施中,气体废物通过一些过滤过程被溶解。放射性废物若不妥善处理或循环再造,其辐射会对环境造成严重问题。要以成本效益高的方式清除大量的放射性废物,应分不同的阶段。本文主要介绍了RNNP放射性废物管理的概况,并介绍了(1)放射性和辐射水平,(2)分类,(3)固体、液体和气体放射性废物的处理,(4)后处理和包装,(5)储存和(6)处置。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study of Radioactive Waste Management of Nuclear Power Plant: Prospect of Rooppur Nuclear Power Plant
The nuclear power plant is required to supply a substantial amount of electricity for a densely populated country like Bangladesh. The government of Bangladesh has attached to a commitment to implement the Rooppur Nuclear Power Plant, and so Bangladesh will be the 33 nuclear powerproducing country after the successful construction of this plant. Bangladesh has planned to construct two power units (Rooppur-1 & Rooppur-2) with a capacity of 1200 MW, each of and is expected to go into operation in 2023. Russian Rosatom State Atomic Energy Corporation is constructing this nuclear power plant, which is the generation-3+ VVER-1200 model. But the main concern is how a third world country like Bangladesh can handle the tons of radioactive waste of RNNP. Radioactive waste i.e., a variety of solids, liquids, and gases which are produced during the generation of nuclear energy in a nuclear reactor. Depending on activity content, solid and liquid waste are disposed of in near-surface or deep geological facilities, and gaseous waste is dissolved by following some filtering process. If not properly disposed of or recycled, irradiation from radioactive waste will cause major problems for the environment. Various stages should be required for the removal of a tremendous amount of radioactive waste in a costeffective way. This paper mainly delineates the proximate of radioactive waste management of RNNP and gives an account of (1) Radioactivity and radiation level, (2) Classification, (3) Treatment of solid, liquid and gaseous radioactive waste, (4) Reprocessing and packaging, (5) Storage and (6) Disposal.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信