建筑信息模型在项目生命周期中的潜力——对冰山模型的反思

Solmaz Mansoori, H. Haapasalo, Janne Harkonen
{"title":"建筑信息模型在项目生命周期中的潜力——对冰山模型的反思","authors":"Solmaz Mansoori, H. Haapasalo, Janne Harkonen","doi":"10.53615/2232-5697.11.85-104","DOIUrl":null,"url":null,"abstract":"Purpose: The implementation of building information modeling (BIM) has been previously approached from various perspectives, but confusion regarding BIM's full potential and on how to apply it remains. The whole is viewed from distinct perspectives to reflect the full potential and explain the tentatively unused potential. \nStudy design/methodology/approach: The study follows a conceptual research approach in conjunction with a single case study. The BIM iceberg model is utilized as an explanatory synthesis frame to reflect perspectives describing BIM utilization. \nFindings: A BIM implementation status framework is developed to describe the BIM utilization maturity in a typical case company. The framework is tested, and indications of support for the logic of the BIM iceberg model are gained. To date, BIM has been used successfully in the early construction project stages (tip of the iceberg, primary BIM). The below-sea-level parts, the collaborative BIM and integrative BIM - the full potential - are rarely recognized. \nOriginality/value: The presented BIM implementation status shows that there is a gap between the full potential of BIM and the level of BIM utilization in practice.","PeriodicalId":30485,"journal":{"name":"International Journal of Management Knowledge and Learning","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Potential of Building Information Modeling in the Project Lifecycle – Reflection Against Iceberg Model\",\"authors\":\"Solmaz Mansoori, H. Haapasalo, Janne Harkonen\",\"doi\":\"10.53615/2232-5697.11.85-104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: The implementation of building information modeling (BIM) has been previously approached from various perspectives, but confusion regarding BIM's full potential and on how to apply it remains. The whole is viewed from distinct perspectives to reflect the full potential and explain the tentatively unused potential. \\nStudy design/methodology/approach: The study follows a conceptual research approach in conjunction with a single case study. The BIM iceberg model is utilized as an explanatory synthesis frame to reflect perspectives describing BIM utilization. \\nFindings: A BIM implementation status framework is developed to describe the BIM utilization maturity in a typical case company. The framework is tested, and indications of support for the logic of the BIM iceberg model are gained. To date, BIM has been used successfully in the early construction project stages (tip of the iceberg, primary BIM). The below-sea-level parts, the collaborative BIM and integrative BIM - the full potential - are rarely recognized. \\nOriginality/value: The presented BIM implementation status shows that there is a gap between the full potential of BIM and the level of BIM utilization in practice.\",\"PeriodicalId\":30485,\"journal\":{\"name\":\"International Journal of Management Knowledge and Learning\",\"volume\":\"34 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Management Knowledge and Learning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53615/2232-5697.11.85-104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Management Knowledge and Learning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53615/2232-5697.11.85-104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

目的:建筑信息模型(BIM)的实施以前已经从不同的角度进行了探讨,但是关于BIM的全部潜力以及如何应用它的困惑仍然存在。从不同的角度看待整体,以反映全部潜力,并解释暂时未使用的潜力。研究设计/方法/方法:该研究遵循概念研究方法与单一案例研究相结合。BIM冰山模型被用作一个解释性综合框架,以反映描述BIM利用的观点。研究发现:开发了一个BIM实施状态框架来描述典型案例公司的BIM利用成熟度。对框架进行了测试,并获得了支持BIM冰山模型逻辑的指示。迄今为止,BIM已经成功地应用于早期建设项目阶段(冰山一角,初级BIM)。海平面以下的部分,协同BIM和集成BIM——全部的潜力——很少得到认可。原创性/价值:所呈现的BIM实施现状表明,BIM的全部潜力与BIM在实践中的利用水平之间存在差距。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Potential of Building Information Modeling in the Project Lifecycle – Reflection Against Iceberg Model
Purpose: The implementation of building information modeling (BIM) has been previously approached from various perspectives, but confusion regarding BIM's full potential and on how to apply it remains. The whole is viewed from distinct perspectives to reflect the full potential and explain the tentatively unused potential. Study design/methodology/approach: The study follows a conceptual research approach in conjunction with a single case study. The BIM iceberg model is utilized as an explanatory synthesis frame to reflect perspectives describing BIM utilization. Findings: A BIM implementation status framework is developed to describe the BIM utilization maturity in a typical case company. The framework is tested, and indications of support for the logic of the BIM iceberg model are gained. To date, BIM has been used successfully in the early construction project stages (tip of the iceberg, primary BIM). The below-sea-level parts, the collaborative BIM and integrative BIM - the full potential - are rarely recognized. Originality/value: The presented BIM implementation status shows that there is a gap between the full potential of BIM and the level of BIM utilization in practice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
27
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信